Partial
Remodel of Suite 115
|
|||||||||
|
Owner: Zimmer
Gulf Frasca Partnership
Architect: Larry S. Bruton |
|||||||||
| Block/ Project | Date | Sheet Type | Sheet # | Sheet | Drawing Kind | Drawing Type | Size | Drawing Name/Description | Notes |
| 090. | 12/04/01 | A0.0 | Architectural | Cover Sheet | |||||
| 090. | 12/04/01 | A2.1 | Architectural | Floor Plans | |||||
| 090. | 12/04/01 | A7.1 | Architectural | Interior Elevations | |||||
| 090. | 12/04/01 | A9.1 | Architectural | Reflected Ceiling Plans | |||||
| 090. | 12/04/01 | E0.1 | Electrical | Legends & Schedules | |||||
| 090. | 12/04/01 | E1.1 | Electrical | Floor Plans, Demolition | |||||
| 090. | 12/04/01 | E2.1 | Electrical | Floor Plans, Lighting | |||||
| 090. | 12/04/01 | E3.1 | Electrical | Floor Plans, Power & Signal | |||||
|
Engineering Consultant:
PAE Consulting Engineers
Engineer: Mark E. Firestone, PE |
|||||||||
| 090. | 12/04/01 | M0.1 | Mechanical | Legends, Schedules & Abbreviations | |||||
| 090. | 12/04/01 | M2.1 | Mechanical | Floor Plans | |||||
|
IC
Laboratory Remodel
|
||||||||||
|
Owner: Emmons
Architects
Architect: |
||||||||||
| Block/ Project | Date | Sheet Type | Sheet # | Sheet | Drawing Kind | Drawing Type | Size | Drawing Name/Description | Notes | |
| 090. | 11/15/01 | A0 | Architectural | E | Cover Sheet | Permit Set (Complete) | ||||
| 090. | 11/15/01 | A1 | Architectural | E | Site Plan/ Egress Information | |||||
| 090. | 11/15/01 | A2 | Architectural | E | Demo Plan | |||||
| 090. | 11/15/01 | A3 | Architectural | E | Floor Plan | |||||
| 090. | 11/15/01 | A4 | Architectural | E | Demo Reflected Ceiling Plan | |||||
| 090. | 11/15/01 | A5 | Architectural | E | Reflected Ceiling Plan | |||||
| 090. | 11/15/01 | A6 | Architectural | E | Power/ Comm Plan | |||||
| 090. | 11/15/01 | A7 | Architectural | E | Interior Elevations | |||||
| 090. | 11/15/01 | A8 | Architectural | E | Details | |||||
|
Engineering
Consultant: PAE Consulting Engineers
Engineer: Mark E. Firestone, PE |
||||||||||
| 090. | 11/15/01 | M1 | Mechanical | E | Legends, Schedules and Abbreviations | |||||
| 090. | 11/15/01 | M2 | Mechanical | E | Demolition Plans | |||||
| 090. | 11/15/01 | M3 | Mechanical | E | Floor Plans | |||||
| 090. | 11/15/01 | M4 | Mechanical | E | Details and Diagrams | |||||
|
Engineer: David
Clair Beach, PE
|
||||||||||
| 090. | 11/15/01 | E1 | Electrical | E | Legends & Luminaire, Schedules | |||||
| 090. | 11/15/01 | E2 | Electrical | E | Demo Plan | |||||
| 090. | 11/15/01 | E3 | Electrical | E | Floor Plans, Lighting | |||||
| 090. | 11/15/01 | E4 | Electrical | E | Floor Plans, Power | |||||
| 090. | 11/15/01 | E5 | Electrical | E | Floor Plans, Signal | |||||
|
Remodel
of Rooms 60-18 & 60-19 for Engineering Computer Support Group
|
||||||||||
|
Owner: PSU Facilities
Architect: Richard B. Piekenbrock |
||||||||||
| Block/ Project | Date | Sheet Type | Sheet # | Sheet | Drawing Kind | Drawing Type | Size | Drawing Name/Description | Notes | |
| 090. | 06/25/01 | A1 | Architectural | Plans, Sections, Elevations, Details, Notes & Schedules | ||||||
| 090. | 06/25/01 | M1 | Mechanical | Mechanical Plans | ||||||
| 090. | 06/25/01 | E0 | Electrical | Legends & Schedules, Electrical | ||||||
| 090. | 06/25/01 | E1 | Electrical | Floor Plans, Demolition, Lighting, Power & Signal | ||||||
|
Open
Source Development Laboratory, Phase 1 & 2
|
||||||||||
|
Owner: Emmons
Architects
Architect: Stuart Emmons |
||||||||||
| Block/ Project | Date | Sheet Type | Sheet # | Sheet | Drawing Kind | Drawing Type | Size | Drawing Name/Description | Notes | |
| 090. | 11/24/00 | A1 | Architectural | Title Page, Vicinity & Site Plans | ||||||
| 090. | 11/24/00 | A2 | Architectural | Demolition Plans, Partition Plans | ||||||
| 090. | 11/24/00 | A3 | Architectural | Ceiling Plans | ||||||
| 090. | 11/24/00 | A4 | Architectural | Power/Communications Plans | ||||||
| 090. | 11/24/00 | A5 | Architectural | Elevations, Sections & Details | ||||||
|
Structural Consultant:
Architectural Systems Division (ASD)
Drawn by: SM |
||||||||||
| 090. | 11/20/00 | S1 | Structural | OSDL Floor | ||||||
| 090. | 11/20/00 | S2 | Structural | OSDL Floor | ||||||
|
Engineering
Consultant: Emmons Southland Industries Engineering Consultants
Architect: Stuart Emmons |
||||||||||
| 090. | 12/05/00 | M1 | Mechanical | Plans, Mechanical | ||||||
| 090. | 12/12/00 | A2 | Architectural Revision | Demolition Plans, Partition Plans | ||||||
| 090. | 12/19/00 | A3 | Architectural Revision | Ceiling Plans Revision | ||||||
| 090. | 11/24/00 | A4 | Architectural | Power/Communications Plans | ||||||
|
Systems
and Networking Suite 100
|
||||||||||
|
Owner: Zimmer
Gulf Frasca (ZGF)
Architect: Larry S. Bruton |
||||||||||
| Block/ Project | Date | Sheet Type | Sheet # | Sheet | Drawing Kind | Drawing Type | Size | Drawing Name/Description | Notes | |
| 090. | 08/08/00 | A1.0 | Architectural | Project Title Sheet, Project Location Plans & Floor Plans | ||||||
|
Architect: Robert
A. Sulek
|
||||||||||
| 090. | 08/08/00 | E1.0 | Electrical | Floor Plans, Lighting | ||||||
| 090. | 08/08/00 | E2.0 | Electrical | Floor Plans, Power & Signal | ||||||
|
Engineering Consultant:
PAE Consulting Engineers
Engineer: Mark E. Firestone, PE |
||||||||||
| 090. | 08/08/00 | M0.1 | Mechanical | Symbols, Schedules & Details, Mechanical | ||||||
| 090. | 08/08/00 | M2.0 | Mechanical | Floor Plans, Mechanical | ||||||
|
Fourth
Avenue Building Study
|
||||||||||
|
Owner:
|
||||||||||
| Block/ Project | Date | Sheet Type | Sheet # | Sheet | Drawing Kind | Drawing Type | Size | Drawing Name/Description | Notes | |
| 090. | 01/24/00 | A5 | Architectural | Plaza Level Suite 120, 130, & 140 Power/ Comm. Furniture Plan | ||||||
| 090. | 01/24/00 | A4 | Architectural | Plaza Level Suite 120, 130, & 140 Reflected Ceiling Plan | ||||||
| 090. | 01/24/00 | A3 | Architectural | Plaza Level Suite 120, 130, & 140 Partition Plan | ||||||
| 090. | 01/24/00 | A2 | Architectural | Plaza Level Suite 120, 130, & 140 Demolition Plan | ||||||
| 090. | 01/24/00 | A1 | Architectural | Plaza Level Suite 120, 130, & 140 Site Plan | ||||||
| 090. | 01/24/00 | A0 | Architectural | Plaza Level Suite 120, 130, & 140 Cover Sheet | ||||||
| 090. | 01/17/00 | FL2 | Second Floor Area | |||||||
| 090. | 01/17/00 | PL | Plaza Level Areas | |||||||
| 090. | 01/17/00 | LL | Lower Level Areas | |||||||
| Facilities Various Projects | |||||||||||||
| Owner: PSU Facilities | |||||||||||||
| Block/ Project | Date | Sheet Type | Sheet | Drawing Kind | Drawing Type | Size | Drawing Name/Description | Drawing Location: | Notes | ||||
| 090. | 07/24/00 | CAD/ | R-03 | As-Built | A | PacifiCorp Lunch Counter | Lunch Counter | ||||||
| 090. | 06/20/00 | CAD/ | R-02 | As-Built | E | Plaza Level Exiting Improvements for Waseda Temporary Classrooms | WASEDA | ||||||
| 090. | 02/22/00 | CAD/ | R-04 | As-Built | D | Furniture Plan Room 100 | Room 100 | ||||||
| 090. | 12/04/97 | CAD/ | NA-5 | A | Second Level Floorplan |
Lib1:/090FAB/090na/090na5.dwg |
Second Level | ||||||
| 090. | 12/04/97 | CAD/ | NA-4 | A | Plaza Level (Street) Floorplan |
Lib1:/090FAB/090na/090na4.dwg |
Plaza Level Street | ||||||
| 090. | 12/04/97 | CAD/ | NA-3S | Structural | A | Lower Level South Floorplan |
Lib1:/090FAB/090na/090na3.dwg |
Circuits Lab Telecom Reception Corridor, Lower Level South Storage Electric Open Office Lobby Exercise Room Micro Lab TV Classroom Vestibule | |||||
| 090. | 12/04/97 | CAD/ | NA-3N | A | Lower Level North Floorplan |
Lib1:/090FAB/090na/090na3.dwg |
Lower Level North Match Line | ||||||
| 090. | 12/04/97 | CAD/ | NA-2 | A | Parking Upper Level 2 Floorplan | Lib1:/090FAB/090na/090na2.dwg | Parking Floor Plan | ||||||
| 090. | 12/04/97 | CAD/ | NA-1 | A | Parking Lower Level I Floorplan | Lib1:/090FAB/090na/090na1.dwg | Parking MBG | ||||||
| 090. | 12/30/96 | CAD/ | R-01 | E | Suites 50 & 85 Temporary Office Installations | Milosevic, City of Portland Print Room, Director, PSU Telecom | |||||||
|
New
Wall Type
|
||||||||||
|
Owner: City of
PDX
|
||||||||||
| Block/ Project | Date | Sheet Type | Sheet # | Sheet | Drawing Kind | Drawing Type | Size | Drawing Name/Description | Notes | |
| 090. | 10/20/99 | 03895 | D | New Full HT Wall | Approved by CIty of PDX | |||||
|
P1
and P2 Parking Re-Striping
|
||||||||||
|
Owner: Gerding/
Edlen Development Co.
Architectural Consultant: Yost Grube Hall |
||||||||||
| Block/ Project | Date | Sheet Type | Sheet # | Sheet | Drawing Kind | Drawing Type | Size | Drawing Name/Description | Notes | |
| 090. | 08/24/99 | A2.01 | P1 Level Plan | |||||||
|
Issued
for Furniture
|
||||||||||
|
Owner: Gerding/
Edlen Development Co.
Architectural Consultant: Yost Grube Hall Furniture Consultant: Pacific Office Furnishings Drawn By: T.R. Kirk - Cobb |
||||||||||
| Block/ Project | Date | Sheet Type | Sheet # | Sheet | Drawing Kind | Drawing Type | Size | Drawing Name/Description | Notes | |
| 090. | 07/21/99 | Architectural | D | 6th Floor, Bureau of Buildings | ||||||
| 090. | 07/21/99 | Architectural | D | 5th Floor, Bureau of Buildings | ||||||
| 090. | 07/21/99 | Architectural | D | 2nd Floor, Permit Center | ||||||
| 090. | 07/19/99 | Architectural | D | 4th Floor, Bureau of Planning | ||||||
| 090. | 07/19/99 | Architectural | D | 3rd Floor, Bureau of Planning - BHCD | ||||||
| 090. | 06/30/99 | Architectural | D | 1st Floor, Permit Center Reconfigure | ||||||
|
FAB,
Suite 70
|
||||||||||
|
Owner: Emmons
Company
Architect: Stuart Emmons |
||||||||||
| Block/ Project | Date | Sheet Type | Sheet # | Sheet | Drawing Kind | Drawing Type | Size | Drawing Name/Description | Notes | |
| 090. | 06/15/99 | CS | Architectural | Cover Sheet | ||||||
| 090. | 06/15/99 | A1 | Architectural | Site Plans & Floor Plans | ||||||
| 090. | 06/15/99 | A2 | Architectural | Partial Plans | ||||||
| 090. | 06/15/99 | A3 | Architectural | Reflected Ceiling Plans | ||||||
| 090. | 06/15/99 | A4 | Architectural | Power & Communications Plans | ||||||
|
Consultant: Glumac
International
Scott P. Vollmoeller |
||||||||||
| 090. | 05/12/99 | M0.1 | Mechanical | Legends, Abbreviations & Details | ||||||
| 090. | 05/12/99 | M2.0 | Mechanical | Plans, Mechanical | ||||||
| 090. | 05/12/99 | M5.0 | Mechanical | Schedules | ||||||
| 090. | 05/12/99 | E0.1 | Electrical | Electrical Legend | ||||||
| 090. | 05/12/99 | E3.0 | Electrical | Power/Communications Plans | ||||||
| 090. | 05/12/99 | E4.0 | Electrical | Lighting Plans | ||||||
|
City
Development Center Tenant Improvements
|
||||||||||
|
Owner: Gerding/
Edlen Development Co.
Architectural Consultant: Yost Grube Hall |
||||||||||
| Block/ Project | Date | Sheet Type | Sheet # | Sheet | Drawing Kind | Drawing Type | Size | Drawing Name/Description | Notes | |
| 090. | 02/26/99 | Bond | T10.3 | Architectural | E | 3rd Level, Raised Floor Plan, Diffuser/Floor Box | ||||
| 090. | 02/26/99 | Bond | T10.4 | Architectural | E | 4th Level, Raised Floor Plan, Diffuser/Floor Box | ||||
| 090. | 02/26/99 | Bond | T10.5 | Architectural | E | 5th Level, Raised Floor Plan, Diffuser/Floor Box | ||||
| 090. | 02/26/99 | Bond | T10.6 | Architectural | E | 6th Level, Raised Floor Plan, Diffuser/Floor Box | ||||
| 090. | 02/26/99 | Bond | T10.6 | Architectural | E | 6th Level, Raised Floor Plan, Diffuser/Floor Box | Duplicate w/ new mark-ups | |||
| 090. | 02/26/99 | Bond | T10.7 | Architectural | E | 7th Floor, Raised Floor Plan, Diffuser/Floor Box | ||||
|
City
Development Center
|
||||||||||
|
Owner: Siemens
Building Technologies, Cerberus Division
|
||||||||||
| Block/ Project | Date | Sheet Type | Sheet # | Sheet | Drawing Kind | Drawing Type | Size | Drawing Name/Description | Notes | |
|
Designed by:
Mike Schaenzer
Drawn by: Becky Torrez |
||||||||||
| 090. | 11/04/98 | SC-9 | As-Built | 6th Floor - Device Layout | ||||||
| 090. | 11/04/98 | SC-8 | As-Built | 5th Floor - Device Layout | ||||||
| 090. | 11/04/98 | SC-7 | As-Built | 4th Floor - Device Layout | ||||||
| 090. | 11/04/98 | SC-6 | As-Built | 3rd Floor - Device Layout | ||||||
| 090. | 11/04/98 | SC-5 | As-Built | 2nd Floor - Device Layout | ||||||
| 090. | 11/03/98 | SC-4 | As-Built | Plaza Level - Device Layout | ||||||
|
Designed by:
Robert Polk
Drawn by: Larry Albee |
||||||||||
| 090. | 03/05/99 | SC-3 | Fire Alarm Junction Box X-X | |||||||
|
Designed and
Drawn by: Mike Schaenzer
|
||||||||||
| 090. | 11/02/98 | SC-2 | Fireman's Graphic Control Panel | |||||||
| 090. | 11/02/98 | SC-1 | Graphic Control Panel | |||||||
|
1900
SW 4th Avenue City Development Center
|
||||||||||
|
Architectural
Firm: Yost/Grube/Hall Architecture, P.C.
Consultant: Mayer/Reed Landscape Architecture Landscape Architect: Carol Mayer Reed |
||||||||||
| Block/ Project | Date | Sheet Type | Sheet # | Sheet | Drawing Kind | Drawing Type | Size | Drawing Name/Description | Notes | |
| 090. | 06/01/98 | Bond | L2 | Landscape Architecture | E | Site Irrigation Plan | Consultant's Project # 50102 | |||
|
Suite
60, Phase 1 & 2
|
||||||||||
|
Owner: 3D Protection
Systems
Drawn by: David Riley Engineer: Dennis Latt |
||||||||||
| Block/ Project | Date | Sheet Type | Sheet # | Sheet | Drawing Kind | Drawing Type | Size | Drawing Name/Description | Notes | |
| 090. | 07/11/97 | A1 | As-Built | Electrical | Partial Floor Plan w/Devices, Phase 1 Electrical | |||||
| 090. | 07/11/97 | A1 | As-Built | Electrical | Partial Floor Plan w/Devices, Phase 2 Electrical | |||||
|
Electrical
|
||||||||||
|
Owner: Christenson
Electric Controls
|
||||||||||
| Block/ Project | Date | Sheet Type | Sheet # | Sheet | Drawing Kind | Drawing Type | Size | Drawing Name/Description | Notes | |
| 090. | 06/17/97 | E1 | Electrical | One-Line Diagram | ||||||
| 090. | 06/17/97 | E2 | Electrical | Load Summary | ||||||
|
1900
SW 4th PSU Electrical Engineering
|
||||||||||
|
Owner: Yost Grube
Hall Architecture
|
||||||||||
| Block/ Project | Date | Sheet Type | Sheet # | Sheet | Drawing Kind | Drawing Type | Size | Drawing Name/Description | Notes | |
| 090. | 05/30/97 | Sepia | LLT4.4 | Furniture Plan | Addendum #1 - 6/23/97 Addendum #5 - 7/24/97 Addendum #7 - 8/29/97 |
|||||
|
PSU
Electrical Engineering/ Engineering Management Program
|
||||||||||
|
Owner: Yost Grube
Hall
|
||||||||||
| Block/ Project | Date | Sheet Type | Sheet # | Sheet | Drawing Kind | Drawing Type | Size | Drawing Name/Description | Notes | |
| 090. | 04/02/97 | No Title | ||||||||
|
US
West Communications Tenant Improvement Plan
|
|||||||||||
|
Owner: Tempurature
Control Mechanical (TCM)
Engineer: Fishel |
|||||||||||
| Block/ Project | Date | Sheet Type | Sheet # | Sheet | Drawing Type | Drawing Kind | Size | Drawing Name/Description | Notes | ||
| 090. | 02/26/97 | MLL | Mechanical | HVAC Plans, Lower Level | |||||||
| 090. | 02/26/97 | MPL | Mechanical | HVAC Plans, Plaza Level | |||||||
|
Fourth
Avenue Building
|
||||||||||
|
Owner: Yost Grube
Hall
Architect: |
||||||||||
| Block/ Project | Date | Sheet Type | Sheet # | Sheet | Drawing Kind | Drawing Type | Size | Drawing Name/Description | Notes | |
| 090. | 09/14/96 | LL-E1.1 | Electrical | Lower Level Electrical Power and Signal | 1 Revision, 1 Addenda '96 | |||||
|
Engineering Consultant:
Glumac International
Engineer: |
||||||||||
| 090. | 08/14/96 | E4.1 | Electrical | Electrical One-Line Diagram | ||||||
| 090. | 08/14/96 | E4.3 | Electrical | Electrical One-Line Diagram | 1 Revision, 1 Addenda 6/28/96 | |||||
|
1900
SW Fourth Avenue
|
|||||||||||
|
Owner: Yost Grube
Hall
Consultant: (Core & Shell) Gerding/Edlin Development Co. (Co-Owner) |
|||||||||||
| Block/ Project | Date | Sheet Type | Sheet # | Sheet | Drawing Kind | Drawing Type | Size | Name/Description | Notes | ||
| 090. | 02/20/97 | CAD | FN1.5 | 30X49.5 | Second Level Finish Map | PacifiCorp Business Center, Training, Files, Command Center | |||||
| 090. | 02/19/97 | CAD | FN1.4 | 30X49.5 | Plaza Level Finish Plan | PSU Continuing Ed, PacifiCorp Customer Service, Portland Development Commission | |||||
| 090. | 02/19/97 | CAD | FN1.3 | 30X49.5 | Lower Level Finish Plan | US West Computer Center, PSU Comp Sec/Res FAC, City of Portland Bureau of Licenses | |||||
| 090. | 01/14/97 | CAD | RP1.5 | 30X49.5 | Second Level Room Map | PacifiCorp Business Center, Training, Files, Command Center | |||||
| 090. | 01/14/97 | CAD | RP1.4 | 30X49.5 | Plaza Level Lower Plan | PSU Continuing Ed, PacifiCorp Customer Service, Portland Development Commission | |||||
| 090. | 01/14/97 | CAD | RP1.3 | 30X49.5 | Lower Level Room Plan | US West Computer Center, PSU Comp Sec/Res FAC, City of Portland Bureau of Licenses | |||||
| 090. | 01/14/97 | CAD | RP1.2 | 30X49.5 | Parking Level 1 Room Plan | ||||||
| 090. | 01/14/97 | CAD | RP1.1 | 30X49.5 | Parking Level 2 Room Plan | ||||||
| 090. | 07/23/96 | CAD | RM2.1 | 30X49.5 | Parking Level 2 Exiting | ||||||
| 090. | 07/23/96 | CAD | RM3.4 | 30X49.5 | Plaza Level Metering | ||||||
| 090. | 07/23/96 | A2.1 | Demolition Plans, Parking Level 1 | PSU/GED | |||||||
| 090. | 07/23/96 | A2.4 | Floor Plans, Parking Level 2 | PSU/GED | |||||||
| 090. | 07/23/96 | A1.1 | Site Plans | PSU/GED | |||||||
|
Owner: Gerding/Edlin
Development Co.
Architectural & Co-Owner: Yost/Grube/Hall Architecture P.C. Mechanical and Electrical: Glumac & Associates, Inc. Structural: KPFF Consulting Engineers |
|||||||||||
| Block/ Project | Date | Sheet Type | Sheet # | Sheet | Drawing Kind | Drawing Type | Size | Name/Description | Notes: Construction Documents Set of Drawings | ||
|
Architect: Nels
P. Hall
|
|||||||||||
| 090. | 09/24/96 | Blue-Line | Cover | Cover Sheet | Consultant's Project # 65400 | ||||||
| 090. | 09/24/96 | Blue-Line | LM1.1 | Location Maps | Consultant's Project # 65406 | ||||||
| 090. | 09/17/96 | Blue-Line | LLT1.1 | Demolition/Partition Plan | Addendum
#1 - 09/24/96 Addendum #2 - 10/24/96 Consultant's Project # 65404 |
||||||
| 090. | 09/18/96 | Blue-Line | LLT1.2 | Interior Details | Consultant's Project # 65404 | ||||||
| 090. | 09/24/96 | Blue-Line | PLT1.1 | Demolition Plan | Consultant's Project # 65406 | ||||||
| 090. | 09/24/96 | Blue-Line | PLT1.2 | Demolition Ceiling Plan | Consultant's Project # 65406 | ||||||
| 090. | 09/24/96 | Blue-Line | PLT1.3 | Partition Plan | Consultant's Project # 65406 | ||||||
| 090. | 09/24/96 | Blue-Line | PLT1.4 | Reflected Ceiling Plan | Consultant's Project # 65406 | ||||||
| 090. | 09/24/96 | Blue-Line | PLT1.5 | Furniture Plan | Consultant's Project # 65406 | ||||||
| 090. | 09/24/96 | Blue-Line | PLT1.6 | Power/ Communication Plan | Consultant's Project # 65406 | ||||||
| 090. | 09/24/96 | Blue-Line | PLT1.5a | ? | Consultant's Project # 65406 | ||||||
| 090. | 09/24/96 | Blue-Line | PLT1.7 | Interior Elevations | Consultant's Project # 65406 | ||||||
| 090. | 09/16/96 | Blue-Line | PLT1.8 | Interior Details | Consultant's Project # 65406 | ||||||
| 090. | 09/16/96 | Blue-Line | PLT1.9 | Interior Details | Consultant's Project # 65406 | ||||||
|
US
West Communications PP&L T.I.
|
|||||||||||
|
Owner: Tempurature
Control Mechanical (TCM)
Engineer: K. Diehl |
|||||||||||
| Block/ Project | Date | Sheet Type | Sheet # | Sheet | Drawing Type | Drawing Kind | Size | Drawing Name/Description | Notes | ||
| 090. | 06/12/96 | UL-M2.1 | Mechanical | 2nd Floor Exisiting HVAC w/New T.I. Diffuser & Equipment Layout | |||||||
| 090. | 06/12/96 | UL-T3 | Mechanical | 2nd Floor Ceiling Plan, HVAC Diffuser Layout | |||||||
|
Urban
Center Condominium Project
|
|||||||||||
|
Owner: David
Evans & Associates, Inc.
|
|||||||||||
| Block/ Project | Date | Sheet Type | Sheet # | Sheet | Drawing Kind | Drawing Type | Location | Size | Name/Description | Notes | |
| 090.005 | 05/17/96 | 2 | 19X24 | Building Level L2 | Office, Finish Floor Elevation, Variable Parcel 2 & 3 | ||||||
| 090.005 | 05/17/96 | 1 | 19X24 | Boundary Map | Table of Contents: Narrative, Basis of Bearings | ||||||
|
U.S.
West - 4th Avenue Building I.T. Infrastructure Survey
|
||||||||||
|
Owner: Miller
- Cook Architects, P.C. A.I.A.
|
||||||||||
| Block/ Project | Date | Sheet Type | Sheet # | Sheet | Drawing Kind | Drawing Type | Size | Drawing Name/Description | Notes | |
|
Architect: Jack
C. Miller | ||||||||||