|
Pacific
Northwest Bell Telephone Co. Fourth Avenue UPS Systems
|
||||||||||
|
Owner: Zimmer
Gunsul Frasca Partnership
Building Engineer: S. M. Teely for PMS |
| Block/ Project | Date | Sheet Type | Sheet # | Sheet | Drawing Kind | Drawing Type | Size | Drawing Name/Description | Notes | |
| 090. | 09/27/79 | Sepia | 0-6566 | M1 | Mechanical | E | Floor Plan - P-2 Level - Mechanical | 07/22/87 #1 Revised UPS for ACU-4 & ACU-5 | ||
| 090. | 09/27/79 | Sepia | 0-6567 | M2 | Mechanical | E | Floor Plan - P-1 Level - Mechanical | |||
| 090. | 09/27/79 | Sepia | 0-6568 | M3 | Mechanical | E | Floor Plan - Lower Level - Mechanical | |||
| 090. | 09/27/79 | Sepia | 0-6569 | M4 | Mechanical | E | Floor Plan - Second Floor - Mechanical | |||
| 090. | 09/27/79 | Sepia | 0-6569A | M5 | Mechanical | E | Details, Diagrams & Schedules - HVAC | 07/22/87 #1 Revised UPS for ACU-4 & ACU-5 | ||
| Size Legend: A = 9"x12", B = 12"x18", C =18"x24", D = 24" x 36", E = 30" x 42", F= 36"x48" |