Fourth Avenue Building Pacific NW Bell (PNB) System Modification
Owner:
Block/ Project Date Sheet Type Sheet # Sheet Type Drawing Type Size Name/Description Notes
090.19 10/04/82 Mylar 0-7105 M4 Mechanical     Schedules Diagrams & Detail  
090.19 10/04/82 Mylar 0-7098 1       General Notes, Details, P-2 Level  
090.19 10/04/82 Mylar 0-7099 2       General Notes Details, L-1 Level  
090.19 10/04/82 Mylar 0-7100 3       Partial Plan, Roof & Cooling Tower Enclosure, Elevation Details  
090.19 10/04/82 Mylar 0-7101 4       Framing Plan & Details, Cooling Tower Enclosure  
090.19 10/04/82 Mylar 0-7102 M1 Mechanical     Chiller Room Plans & Sections  
090.19 10/04/82 Mylar 0-7103 M2 Mechanical     Upper Parking Level Mechanical Plan & Details  
090.19 10/04/82 Mylar 0-7104 M3 Mechanical     Diagrams & Details  
090.19 10/04/82 Mylar 0-7106 E1 Electrical     P1 Parking Level Partial One-Line Diagram  
090.19 10/04/82 Mylar 0-7107 E2 Electrical     Lower Level Floor Plan  
090.19 10/04/82 Mylar 0-7108 E3 Electrical As-Built   Plaza Level Floor Plans, Notes  
090.19 10/04/82 Mylar 0-7109 E4 Electrical As-Built   Second Floor Plan, Roof Plan Partial One-Line Diagram  
090.19 01/04/83 Mylar 0-7099A A-2A Architectural     Fourth Avenue Computer Floor Expansion - Partial Floor Plan - Lower Level Demolition Plan Details  
Size Legend:
A = 8.5" x 11", B = , C =, D = 24" x 36", E = 30" x 42"