| Facilities and Planning |
|
|
Architectural,
Engineering and Construction Services
|
|
|
|
|
| Fourth Avenue Building Archived Drawings *Archived Drawings filing system information: Archival System File Guide. |
|
|
|
|
| Complete Drawings Information List | |
| Key: Block. Project# / Year - Project Name (Brief description listed below) | |
090.
/ 2001 |
Partial
Remodel of Suite 115 (Consultant Drawings) Partial Remodel of Plaza Level, Suite 115. Schedules, Demolition, Interior Elevations, Reflected Ceilings, Mechanical, Electrical, Lighting, Power, Signal, Details & Floor Plans |
090.
/ 2001 |
IC
Design Test Lab Remodel (Consultant Drawings) Remodel of IC Design and Test Laboratory. Legends, Luminaire, Schedules, Electrical, Demolition, Mechanical, Lighting, Power, Signal and Floor Plans |
090. / 2001 |
Remodel
of Rooms 60-18 and 60-19 for Engineering Support Group Remodel of Classrooms 60-18 & 60-19 the College of Engineering's Computer Action Team (CAT Team). Sections, Elevations, Details, Notes, Schedules, Demolition, Lighting, Power, Signal, Mechanical, Electrical & Floor Plans |
090. / 2000 |
Open
Source Development Lab, Phase 1 and 2 (Consultant Drawings) Vicinity, Site, Demolition, Partition, Power/Communications, Mechanical, Ceiling, Elevations, Sections, Details & Floor Plans |
090. / 2000 |
Systems
and Networking Suite 100 (Consultant Drawings) Project Location, Schedules, Lighting, Power, Signal, Electrical, Mechanical, Details, & Floor Plans |
090.
/ 2000 |
Fourth
Avenue Building Study (Consultant Drawings) Plaza Level Suites 120, 130 & 140 Site, Demolition, Partition, Reflected Ceiling, Power/Commumnication & Furniture Plans; Plaza, Lower & Second Level Areas |
090. / 1996-2000 |
Facilities
Various Projects Parking Levels 1 and 2 Floorplans, Lower Level Matchline, Circuits Lab Reception; Lower, Plaza and Second Level Floor Plans; Waseda Temporary Exiting for Classrooms, Temporary Suites 50 and 85, PacifiCorp Lunchroom and Room 100 Furniture |
090. / 1999 |
New
Wall Type (Consultant Drawing) City of Portland, New Full Wall Type |
090. / 1999 |
P1
and P2 Parking Re-Striping (Consultant Drawing) Parking Level Re-Striping Plans |
090. / 1999 |
Issued
for Furniture (Consultant Drawings) 1st through 6th Floors Furniture Plans |
090.
/ 1999 |
City
Development Center Tenant Improvements (Consultant Drawings) 3rd Level through 7th Floor: Raised Floor Plans, Diffuser/Floor Box |
090.
/ 1999 |
FAB
Suite 70 (Consultant Drawings) Site, Partial, Reflected Ceiling, Power, Communications, Schedules, Electrical, Mechanical, Lighting, Details & Floor Plans |
090.
/ 1998 |
1900
SW 4th Avenue City Development Center (Consultant Drawings): Landscape Architecure Plan |
090.
/ 1998-1999 |
City
Development Center (Consultant Drawings) Recorded As-Builts: Fire Alarm Plans |
090.
/ 1997 |
Suite
60, Phase 1 and 2 (Consultant Drawings) Recorded As-Builts: Partial Floor Plan w/Devices, Phase 1& 2 Electrical |
090.
/ 1997 |
1900 SW 4th PSU Electrical
Engineering (Consultant Drawing) Furniture Plan |
090.
/ 1997 |
Electrical (Contractor Drawings) One-Line Diagram & Load Summary |
090.
/ 1997 |
Electrical
Engineering/Engineering Management Program (Consultant Drawing) |
090.
/ 1997 |
US
West Tenant Improvement (Consultant Drawings) Lower Level & Plaza Level HVAC Plan |
090.
/ 1996 |
Fourth
Avenue Building (Consultant Drawings) Electrical Power and Signal and One-Line Diagram |
090. / 1996-1997 |
1900
SW Fourth Avenue (Consultant Drawings) Plaza & Lower Level Finish Plans, Parking Levels 1&2 Room Plans, Second Level Room & Finish Maps, Plaza & Lower Level Room Plans & Parking Level 2 Exiting Plan, Site & Demolitions Plans |
090.
/ 1996 |
US
West PP&L T.I. (Consultant Drawings) HVAC w/new T.I., Diffuser & Equipment Layouts, Ceiling & Floor Plans |
090.
/ 1996 |
Urban
Center Condominium Project (Consultant Drawings) Boundary Map, Building Level 2 |
090.
/ 1996 |
U.S.
West - 4th Avenue Building I.T. Infrastructure Survey (Consultant Drawings) Mechanical Drawings |
090.
/ 1994 |
US
West Communications Fourth Avenue Piping Modification (Consultant Drawings) Interior Elevations, Hot & Cold Water Piping Diagrams, Plumbing & Floor Plans |
090.
/ 1992 |
Fourth
Avenue Building US West Communications Remodel (Consultant Drawings) |
090.
/ 1990 |
Fourth
Avenue Building Parcel #47 Cooling Tower Replacement (Consultant Drawings) Recorded As-Builts |
090.
/ 1989 |
Pacific
Northwest Bell Portland Processing Data Center (Consultant Drawings) Recorded As-Builts: Electrical Single-Line Diagrams |
090.
/ 1987-1988 |
Continuing
Property Records Distribution (Consultant Drawings) Electrical One-Line Diagrams |
090.
/ 1986 |
Pacific
Northwest Bell Portland Data Processing Center (Consultant Drawings) Recorded As-Builts: Electrical Single-Line Diagrams |
090.
/ 1985 |
PNB
Fourth Avenue Building - Computer Center Expansion (Consultant Drawings) Recorded As-Builts |
090.
/ 1984 |
Fourth
Avenue Building - Bill Enclosing Area Remodel (Consultant Drawings) |
090.
/ 1983 |
Fourth
Avenue Building (Consultant Drawings) |
090.
/ 1983 |
Fourth
Avenue Building - Interior Alterations RSC (Consultant Drawings) |
090.
/ 1983 |
Pacific
NW Bell (PNB) Fourth Avenue Office Complex (Consultant Drawings) Electrical, UPS By-Pass Circuit & Complex One-Line Distribution Diagram |
090.20
/ 1982 |
MIC
Remodel (Consultant Drawings) |
090.19
/ 1982-1983 |
Fourth
Avenue Building Pacific NW Bell (PNB) System Modification (Consultant Drawings) |
090.18
/ 1982 |
Fourth
Avenue Building Energy Management and Control System (EMCS) (Consultant Drawings) |
090.17
/ 1981 |
Fourth
Avenue Building CMR Plaza Level Remodel (Consultant Drawings) |
090.16
/ 1981 |
Fourth
Avenue Building Computer Room Project (Consultant Drawings) |
090. /
1979 |
Pacific
Northwest Bell Telephone Co. Fourth Avenue UPS Systems (Consultant Drawings) Mechanical UPS Systems Drawings |
090.10
/ 1974-1976 |
Pacific
NW Bell (PNB) Telephone Company Fourth Avenue Office Complex (Consultant Drawings) |
090.09
/ 1973 |
Fourth
Avenue Computer Replacement (Consultant Drawings) Second Floor Reflected Ceiling Plan Details & Notes, Second Floor Partial Plans |
090.08
/ 1973-1974 |
Fourth
Avenue Office Complex (Consultant Drawings) |
090.07
/ 1973 |
Loading
Dock Relocation (Consultant Drawings) |
090.06
/ 1972 |
Fourth
Avenue Building - Interior Remodeling (Consultant Drawings) |
090.05
/ 1972 |
Un-Named
Project (Consultant Drawings) |
090.04
/ 1972 |
Fourth
Avenue Building - Interior Remodel (Consultant Drawings) Recorded As-Builts |
090.03
/ 1969 |
First
and Second Floor Remodeling (Consultant Drawings) |
|
090.02 / 1968 |
Alteration to Fourth Avenue Building, Transformer Vault Vent Housing |
| 090.01
/ 1962 |
Fourth
Avenue Building Pacific NW Bell (PNB) Telephone Company (Consultant Drawings) Building Construction. Original Floor Plans, Details & Specification |