|
President's Residence Construction
|
| Block/
Project |
Date |
Sheet
Type |
Sheet
# |
Sheet |
Drawing
Kind |
Drawing
Type |
Size |
Drawing
Name/Description |
Notes |
| 109.01 |
10/10/48 |
|
01 |
|
|
|
D |
Basement Plan |
Missing |
| 109.01 |
01/10/49 |
|
02 |
|
|
|
D |
First Floor Plan |
Missing |
| 109.01 |
01/10/49 |
|
03 |
|
|
|
D |
Second Floor Plan |
Missing |
| 109.01 |
01/10/49 |
|
04 |
|
|
|
D |
South Elevation |
Missing |
| 109.01 |
10/10/49 |
|
05 |
|
|
|
D |
West Elevation |
Missing |
| 109.01 |
01/10/49 |
|
06 |
|
|
|
D |
North Elevation |
Missing |
| 109.01 |
01/10/49 |
|
07 |
|
|
|
D |
Sections |
Missing |
| 109.01 |
01/10/49 |
|
08 |
|
|
|
D |
Details |
Missing |
| 109.01 |
01/10/49 |
|
09 |
|
|
|
D |
Plan & Elevation of Window Bay |
Missing |
| 109.01 |
04/01/89 |
|
A-01 |
|
|
|
D |
President's House Plot Plan |
First Dated 12/6/72, Revised 1/77 |
| 109.01 |
04/01/89 |
|
A-01A |
|
|
|
B |
President's House Plot Plan |
First Dated 12/6/72, Revised 1/77 |
| 109.01 |
01/19/77 |
|
A-01B |
|
|
|
B |
President's House Plot Plan |
|
| 109.01 |
12/13/90 |
|
A-02 |
|
|
|
D |
Basement Plan |
Boiler Room, Laundry, Party Room, Crawl Space |
| 109.01 |
12/13/90 |
|
A-03 |
|
|
|
D |
First Floor Plan |
Living Room 101, Dining Room 102, Foyer L101, Fmaily Room 107 |
| 109.01 |
12/13/90 |
|
A-04 |
|
|
|
D |
Second Floor Plan |
Master Bedroom 201, Bedroom 202, Sewing 205, Bedroom 207 & 208, Master Bath 210, Playroom 206 |
| 109.01 |
02/24/84 |
|
A-05 |
|
|
|
D |
Irrigation Plan |
Legal Description, Valve SChedule, Irrigation Schedule, Equipment Schedule |
| 109.01 |
04/18/78 |
|
A-06 |
|
|
|
A |
Garage Apartment |
First & Second Floors |
| 109.01 |
04/17/89 |
|
A-07 |
|
|
|
B |
Concrete Patio Addition |
Site Plan, Legend, Thickened Slab, Planter |
| 109.01 |
03/01/72 |
|
A-08 |
|
|
|
D |
Concrete Curbs for Driveway |
Extruded Concrete Curb |
| 109.01 |
1986 |
|
A-09 |
|
|
|
D |
Site Plan |
First Floor Elevation |
| 109.01 |
01/01/87 |
|
A-10 |
|
|
|
C |
SIte Plan with Electrical |
Mount on Porch SoffitT, 100W Lights, Pole Mounted Lights, Driveway Lights, 100W Accent Lights |
| 109.01 |
08/04/97 |
|
G-NA-1 |
|
|
|
A |
President's Garage: 1st, 2nd & Roof Plans |
Grounds Storage, Parking, Guest Restroom, Cabinet, Slope, Vent, Gutter, Drawn By H.V. |
| 109.01 |
07/11/97 |
|
NA-1 |
|
|
|
A |
President's Residence Basement Floor Plan |
Unexcavated, Crawl Space, Laundry, Boiler Room, Party Room, Power Panels, Central Vacuum, Water Heater, Air Conditioner |
| 109.01 |
07/11/97 |
|
NA-2 |
|
|
|
A |
President's Residence First Floor Plan |
Entry, Dining, Living, Family, Car Port, Kitchen, Pantry, Coat Room |
| 109.01 |
07/11/97 |
|
NA-3 |
|
|
|
A |
President's Residence Second Floor Plan |
Master Bedroom, Deck, Dressing, Bedrooms, Play Room |
| 109.01 |
07/24/97 |
|
NA-4 |
|
|
|
A |
President's Residence Roof Plan |
Chimney, Vent, Gutter, Flat Roofs Cover the Porch Below |
| 109.01 |
|
|
P-1 |
|
|
|
D |
Planting Plan |
Missing |
| 109.01 |
02/27/70 |
|
PH-2 |
|
|
|
D |
Alterations to Residence |
Site Plan, Reflected Ceiling Plan, Basement Study Plan, First Floor Partial Plan |
| 109.01 |
04/17/89 |
|
R-1 |
|
|
|
B |
Patio Remodel |
Concrete Patio Addition |