Various Miscellaneous Projects & Drawings
|
||||||||||
| Block/ Project | Date | Sheet Type | Sheet # | Sheet | Drawing Kind | Drawing Type | Size | Drawing Name/Description | Notes | |
Engineering Consultants: McKenzie Engineering, Consultant Engineers |
||||||||||
| 159.07 | 08/26/75 | 2-A | D | Floors 7-14, Typical Floor Plans | Redline | |||||
Electrical Engineering Consultants: Cundiff Engineering, Inc. |
||||||||||
| 159.07 | 02/12/91 | E-1 | Electrical | D | New Transformer and Layout | Partial Second Level Power Floor Plan, Trenching Detail, Partial First Floor Level Power Floor Plan | ||||
| 159.07 | 05/21/82 | E-9 | As-built | Electrical | D | Student Housing: Floor Plans | Partial Plan Basement Boiler Room | |||
| 159.07 | 05/21/82 | F-9 | Electrical | D | Student Housing: Sprinkler System Floor Plans | First & Second Floor Plans, Typical Floors 3-14, Partial Plan Sub-Basement Chiller Room, Sprinkler Locations | ||||
| 159.07 | 12/01/82 | 13 of 15 | As-built | Electrical | D | Ondine, First & Second Floor Sprinkler System | Section A-A, Fireguard Sprinkler Systems | |||
| 159.07 | 12/01/82 | 14 of 15 | As-built | Electrical | D | Ondine, Floors 8-15 Sprinkler System | Piping, 15th Floor Control Valve Piping Plan, Section Through Corridor Section Looking South, Fireguard Sprinkler Systems | |||
| 159.07 | 12/01/82 | 15 of 15 | As-built | Electrical | D | Ondine, Floors 3-14 Sprinkler System | Partial Plan Sub-Basement Chiller Room, Typical Floor Control, Corridor Section Looking South, Fireguard Sprinkler Systems | |||
Consultants: CBG Associates |
||||||||||
| 159.07 | 05/21/82 | M-6 | Mechanical | D | Student Housing Rehabilition: Demolition and Plan | Boiler Room Demolition, Plan 2nd Floor, General Notes, Sheet Notes | ||||
| 159.07 | 05/21/82 | M-7 | Mechanical | D | Student Housing: Heating System and Equipment Schedules | Pressure Reducing Station, Heating System Schematics, Gas Vent Detail, Equipment Schedules, Base Mounted Pump Installation | ||||
Architectural Consultants: SERA Architects Consultants: Carson, Bekooy, Gulick & Associates |
||||||||||
| 159M | 05/21/82 | M-06 | D | Student Housing Rehabilitation: Ondine Sprinklers | Floors 2-14 Typical Floor Plan, Sub-Basement Chiller Room, Elevator Sprinkler Location, Sheet Notes | |||||
| 159.07 | 05/21/82 | P-6 | Mechanical | D | Student Housing Rehabilition: Ondine | Boiler Room Demolition & Plan, Partial Plan Sub-Basement Chiller Room, Water Treatment Station, Gas Water Heater Piping, Equipment Schedules | ||||
Mechanical Consultants: Neuman |
||||||||||
| 159M | 1983 | M-27 | As-built | Mechanical | E | Ondine Piping Sub-basement | ||||
| 159M | 1983 | M-28 | As-built | Mechanical | E | Ondine Plumbing Basement | ||||
| Size Legend: A = 9"x12", B = 12"x18", C =18"x24", D = 24"x36", E = 30"x42", F= 36"x48" |