Block 159 Ondine Building Drawing Archives
Various Miscellaneous Projects & Drawings
Block/ Project Date Sheet Type Sheet # Sheet Drawing Kind Drawing Type Size Drawing Name/Description Notes
Engineering Consultants: McKenzie Engineering, Consultant Engineers
159.07 08/26/75   2-A       D Floors 7-14, Typical Floor Plans Redline
Electrical Engineering Consultants: Cundiff Engineering, Inc.
159.07 02/12/91   E-1     Electrical D New Transformer and Layout Partial Second Level Power Floor Plan, Trenching Detail, Partial First Floor Level Power Floor Plan
159.07 05/21/82   E-9   As-built Electrical D Student Housing: Floor Plans Partial Plan Basement Boiler Room
159.07 05/21/82   F-9     Electrical D Student Housing: Sprinkler System Floor Plans First & Second Floor Plans, Typical Floors 3-14, Partial Plan Sub-Basement Chiller Room, Sprinkler Locations
159.07 12/01/82   13 of 15   As-built Electrical D Ondine, First & Second Floor Sprinkler System Section A-A, Fireguard Sprinkler Systems
159.07 12/01/82   14 of 15   As-built Electrical D Ondine, Floors 8-15 Sprinkler System Piping, 15th Floor Control Valve Piping Plan, Section Through Corridor Section Looking South, Fireguard Sprinkler Systems
159.07 12/01/82   15 of 15   As-built Electrical D Ondine, Floors 3-14 Sprinkler System Partial Plan Sub-Basement Chiller Room, Typical Floor Control, Corridor Section Looking South, Fireguard Sprinkler Systems
Consultants: CBG Associates
159.07 05/21/82   M-6     Mechanical D Student Housing Rehabilition: Demolition and Plan Boiler Room Demolition, Plan 2nd Floor, General Notes, Sheet Notes
159.07 05/21/82   M-7     Mechanical D Student Housing: Heating System and Equipment Schedules Pressure Reducing Station, Heating System Schematics, Gas Vent Detail, Equipment Schedules, Base Mounted Pump Installation
Architectural Consultants: SERA Architects
Consultants: Carson, Bekooy, Gulick & Associates
159M 05/21/82   M-06       D Student Housing Rehabilitation: Ondine Sprinklers Floors 2-14 Typical Floor Plan, Sub-Basement Chiller Room, Elevator Sprinkler Location, Sheet Notes
159.07 05/21/82   P-6     Mechanical D Student Housing Rehabilition: Ondine Boiler Room Demolition & Plan, Partial Plan Sub-Basement Chiller Room, Water Treatment Station, Gas Water Heater Piping, Equipment Schedules
Mechanical Consultants: Neuman
159M 1983   M-27   As-built Mechanical E Ondine Piping Sub-basement  
159M 1983   M-28   As-built Mechanical E Ondine Plumbing Basement  
Size Legend: A = 9"x12", B = 12"x18", C =18"x24", D = 24"x36", E = 30"x42", F= 36"x48"