|
Facilities Remodel Drawings
|
||||||||||
Architect/Owner: PSU - Facilities & Planning |
||||||||||
| Block/ Project | Date | Sheet Type | Sheet # | Sheet | Drawing Kind | Drawing Type | Size | Drawing Name/Description | Notes | |
| 161R | 02/25/83 | R-01 | B | Security Door Installation | W & E Corridors, North Elevation | |||||
| 161R | 03/03/83 | R-02 | B | Counter Modifications, Room 160 | Plan Of Remodel For Electronics Laboratory Counter, Counter Top Tempured Glass Screen Detail |
|||||
| 161R | 03/14/83 | R-03 | A | Remodel Rooms 176 & V182 | Remove Cabinets, Relocate Door & Frame | |||||
| 161R | 03/10/83 | R-04 | A | Terminal Room 128 | North Elevation | |||||
| 161R | 03/11/83 | R-05 | A | Computer Science Terminal Room 128 | Partition Detail | |||||
| 161R | 05/11/83 | R-06 | B | Lower Level Remodel 20, 20A-C& 24 | Partial Lower Level Plan, General Notes | |||||
| 161R | 06/28/83 | R-07 | A | Security Wall 170 | Elevation | |||||
| 161R | 05/29/86 | R-08 | A | Proposed Montgomery Street Entry | Handicap Operator | |||||
| 161R | 03/27/84 | R-09 | A | Room 120 Remodel | ||||||
| 161R | 05/04/84 | R-10 | As-Built | D | Remodel 20A-C, 139, 140, 142, 144, 154A-B & 170A-H | Remodel Plans, Partial Plan 139, Section Existing Cabinet With Screen & At New Counter Top Between Cabinets | ||||
| 161R | 05/04/84 | R-11 | A | Aluminum Glass Screen, Room 170 | Partial Plan | |||||
| 161R | 05/16/84 | R-12 | B | CAD Microcomputer Laboratory 139 & 140 | ||||||
| 161R | 03/27/84 | R-13 | B | Remodel Plan 113 & 118 | ||||||
| 161R | 01/17/85 | R-14 | A | Room 120 Remodel | Remove & Relocated Partitions, Storage | |||||
| 161R | 01/29/86 | R-15 | A | Stair Rehabilitation 102 | Notes | |||||
| 161R | R-16 | A | Handicap Rehabilition/ Montgomery Entry | Montgomery Street Entry Plan | ||||||
| 161R | 01/09/86 | R-17 | A | Remodel 138D | ||||||
| 161R | 12/01/88 | R-25 | B | Electrical Engineering Room 138 Lab Remodel | Floor Plan, Elevation A, Section A-A | |||||
| 161R | 08/03/88 | R-26 | A | Remodel 138D PCAT Lab | Counter With Plywood Supports | |||||
| 161R | 04/01/89 | R-28 | B | Exterior Elevation, Plan View | New Exterior Front Entry Doors With Panic Hardware | |||||
| 161R | 09/15/92 | R-29 | A | New Counter & Sink, Room 120 Remodel | Demolition Plan, Elevations, Construction Notes, Job #4, Deduct Alternate #1 | |||||
| 161R | 08/06/92 | R-30 | B | Rooms 154A & 154B Remodel, Construction Notes | Demolition Plan, Wall Section | |||||
| 161R | 08/06/92 | R-31 | B | Rooms 128A & 128B Remodel | Floor Plan & Wall Section | |||||
| 161R | 08/06/92 | R-32 | E | Rooms 128 & 128B Remodel | Mechanical & Lighting Plans, Construction Notes | |||||
| 161R | 10/03/94 | R-33 | E | Suite 128 Remodel | Demolition Plan, Construction Plan, Reflected Ceiling Plan, Notes | |||||
| 161R | 07/05/89 | R-35 | B | Lower Level Parking, Painting Of Walls & Columns | Legend, Concrete Walls, Metal Doors | |||||
| 161R | 04/22/98 | R-36 | As-Built | E | Office Remodel | |||||
| 161R | 12/02/98 | R-37 | As-Built | E | Remodel Of Rooms 124, 137, 150A&B, 160 Cover | |||||
| 161R | 12/02/98 | R-38 | As-Built | E | Remodel Of 124, 137, 150A& B, 160 | Cover | ||||
| 161R | 12/02/98 | R-39 | As-Built | E | Remodel Of 124, 137, 150A&B, 160 | Cover | ||||
| 161R | 02/25/99 | R-40 | As-Built | A | Remodel Of Room 20 | |||||
| Size Legend: A = 9"x12", B = 12"x18", C =18"x24", D = 24" x 36", E = 30" x 42", F= 36"x48" |