Block 189 University Services Building Drawing Archives
Portland State College Services Building
Architectural Consultants: Witt-Englund-Plummer
Structural Consultants: Cooper & Rose
Mechanical Engineering Consultants: Kroeker & Associates
Electrical Engineering Consultants: Grant Kelley & Associates
Block/ Project Date Sheet Type Sheet # Sheet Drawing Kind Drawing Type Size Drawing Name/Description Notes
189.02 05/20/69   A-01     Architectural D Existing Site Existing Survey Information, Index Of Drawings
189.02 11/15/70   A-02   As-Built Architectural D Site & Roof Plan General & Contractor Notes
189.02 11/15/70   A-03   As-Built Architectural D Door Schedule: Basement & First Floors Door & Hardware Schedule, Notes, Door Patterns
189.02 11/15/70   A-04   As-Built Architectural D Door Schedule: First, Second & Third Floors Door & Hardware Schedule, Notes, Door Patterns
189.02 11/15/70   A-05   As-Built Architectural D Door Schedule: Third & Fourth Floors Door & Hardware Schedule, Notes, Door Patterns
189.02 11/15/70   A-06   As-Built Architectural D Opening Details Relite Schedule, Frames, Sills, Future Elevator
189.02 11/15/70   A-07   As-Built Architectural D Office: Basement Plan Reception Counter & Railing, Basement Floor Plan
189.02 11/15/70   A-08   As-Built Architectural D Parking: Basement Plan Traffic Arrows
189.02 11/15/70   A-09   As-Built Architectural D Office: First Floor Plan Finish Schedule, Sign Elevation, Counter At Drying 108
189.02 11/15/70   A-10   As-Built Architectural D Parking: First Level Plan Elevation Of Ramp, Steel Stair At Loading Dock
189.02 11/15/70   A-11   As-Built Architectural D Office: Second Floor Plan Finish Schedule, Plaster Vent Case, Chalk & Tackboard, Joint, West Elevation Conference 225, Counter 229, Cabinet & Coat Rack 321, 420
189.02 11/15/70   A-12   As-Built Architectural D Office: Third Floor Plan Finish Schedule, Screen Panel, Panel Base
189.02 11/15/70   A-13   As-Built Architectural D Office: Fourth Floor Plan Finish Schedule, Shaft Enclosure Detail
189.02 11/15/70   A-14   As-Built Architectural D Noth & South Elevations  
189.02 11/15/70   A-15   As-Built Architectural D East & West Elevations  
189.02 11/15/70   A-16   As-Built Architectural D 1/8" Sections Sections A-16 & B-16, Typical Sleeve Through Plaster, Partial Elevation Of North Vestibule
189.02 11/15/70   A-17   As-Built Architectural D 1/8" Sections Sections A-17 & B-17
189.02 11/15/70   A-18   As-Built Architectural D Stair "A" Plans Sections A-18 & B-18
189.02 11/15/70   A-19   As-Built Architectural D Stair "B" Plans Section D-19 & E-19, Fireman's Ladder
189.02 11/15/70   A-20   As-Built Architectural D Stair "B" Sections Section A-20, B-20 & C-20
189.02 11/15/70   A-21   As-Built Architectural D Stairs "C" & "D" Rubber Nosing At Stair "B", Typical Stair Detail
189.02 11/15/70   A-22   As-Built Architectural D Roof Details Roof Edge, Typical Mechanical Equipment, Opening, Typical Perimeter Flashing
189.02 05/20/69   A-23     Architectural D Wall Details Grooves At Brick Tile Veneer, Partial Elevation
189.02 05/20/69   A-24     Architectural D Wall Details Concrete Bench, Wood Bumper, Gargoyle, Pre-Cast Concrete Fin Anchor
189.02 05/20/69   A-25     Architectural D Window Details Head, Sill, Jamb, Mull, Pumper Connections, Exhaust Enclosure, Window Type
189.02 05/20/69   A-26     Architectural D Reflected Ceiling Plans Partial First Floor, First Level, Basement Reflected Ceiling Plans. Second Floor Reflected Ceiling Plan
189.02 05/20/69   A-27     Architectural D Reflected Ceiling Plans: Third & Fourth Floors  
189.02 05/20/69   A-28     Architectural D Toilet Room Details Vanity Counter, Locker Base, Water Cooler, Bench, Cement Topping & Base, Men's & Women's Lockers
189.02 05/20/69   A-29     Architectural 14x24 Abbreviations & Notes  
189.02 12/18/70   E-01   As-Built Electrical D Plot & Roof Plan Symbol Legend, Detail Of Light Standard, Mechanical Control Diagram, Detail Fixture Type, Stair "D" & Montgomery Street Entry Lighting Control
189.02 12/18/70   E-02   As-Built Electrical D Riser Diagram Conduit Routing Plan, Panel Schedule, Breaker Schedule, Connected Loads, Future Load
189.02 12/18/70   E-03   As-Built Electrical D Basement Parking Lighting Plan  
189.02 12/18/70   E-04   As-Built Electrical D Basement Floor Lighting Plan Schematic Diagram: Fire Alarm System. Fire Alarm Annuciator Drops. Vent Fan Cut-Off System
189.02 12/18/70   E-05   As-Built Electrical D Basement Floor Lighting Plan Telephone Riser Diagram, Chiome Mounting Plate
189.02 12/18/70   E-06   As-Built Electrical D First Level Lighting Plan  
189.02 12/18/70   E-07   As-Built Electrical D First Level Power & Signal Plan MCC #1, MCC #2 & MCC #3
189.02 12/18/70   E-08   As-Built Electrical D First Floor Lighting, Power & Signal Plans Montgomery Street Entry, Kick Plate Detail
189.02 12/18/70   E-09   As-Built Electrical D Second Through Fourth Level Lighting Plan Stair "B" Exit Signs
189.02 12/18/70   E-10   As-Built Electrical D Second Floor Lighting, Power & Signal Plans Signal System Diagram. Detail: Monitor 189-1
189.02 12/18/70   E-11   As-Built Electrical D Third Floor Lighting, Power & Signal Plans Pull Box Details: Pull Box "A" & "B"
189.02 12/18/70   E-12   As-Built Electrical D Fourth Floor Lighting, Power & Signal Plans  
189.02 02/01/71   M-01   As-Built Mechanical D Plot & Roof Plan Section, Symbols, Details
189.02 02/01/71   M-02   As-Built Mechanical D Foundation Piping Details, Elevation, Paint Spray Booth Exhaust Terminal
189.02 02/01/71   M-03   As-Built Mechanical D Office: Basement Piping Section, Basement Water Headers Diagram, Part Plan Lower Basement
189.02 02/01/71   M-04   As-Built Mechanical D Office: Basement Ducts Water Feeder Piping, Fire Protection Standpipes, Sections
189.02 02/01/71   M-05   As-Built Mechanical D Parking: Basement Ducts & Piping Typical Sections
189.02 02/01/71   M-06   As-Built Mechanical D Office: First Floor Ducts & Piping Piping Below Pedestrian Overpass: Section & Profile
189.02 02/01/71   M-07   As-Built Mechanical D Parking: First Level Piping Mechanical Joint, Electric Heating Cable Detail
189.02 02/01/71   M-08   As-Built Mechanical D Parking: First Level Ducts; Second, Third & Fourth LevelS Piping Typical Piping Connection - Fan Coil Unit, Cabinet Unit Heaters, Typical Heating Piping Connections
189.02 02/01/71   M-09   As-Built Mechanical D Office: Second Floor Ducts & Piping Duct Construction Details, Nameplate Schedule, Systems Control Board Details - Mechanical Rooms 25 & 112
189.02 02/01/71   M-10   As-Built Mechanical D Office: Third & Fourth Floor Ducts & Piping Guide Detail, Guide & Anchor Spacing, Anchor Detail, Sections
189.02 02/01/71   M-11   As-Built Mechanical D Office: Third Floor Fan Room 325 BU-1 Mixing Damper Detail, Mixing Damper Schedule, Sections
189.02 02/01/71   M-12   As-Built Mechanical D Piping Diagrams & Details Roof Drain Riser Diagram, Steam Piping Diagram, Plumbing Riser Diagram. Cooling Water, Heating & AC Piping Diagrams. AAV Detail, F&T Detail
189.02 05/10/69   S-01     Structural D General Notes & Typical Details Typical Bay Camber Pattern, Freestanding Block Wall 109, 115, 117, Non-bearing Wall Footing, Typical Corner Plans, Block Wall, Reinforced Detainer Wall Opening, Wall Footing Step, Pipe Under Fitting, Pipe Through & Parallel To Fitting
189.02 11/15/70   S-02   As-Built Structural D Office: Basement, Foundation & First Floor Framing Plans Sections, Montgomery Street Entrance Framing Plan
189.02 11/15/70   S-03   As-Built Structural D Office: Second & Third Floor Framing Plans Sections
189.02 05/20/69   S-04     Structural D Office: Fourth Floor & Roof Framing Plans Future Fifth Floor
189.02 11/15/70   S-05   As-Built Structural D Parking: Basement Level & Footing Plan Sections, Notes
189.02 11/15/70   S-06   As-Built Structural D Parking: First Level Framing Plan Sections
189.02 11/15/70   S-07   As-Built Structural D Parking: Second Level Framing Plan Sections
189.02 11/15/70   S-08   As-Built Structural D Parking: Third Level Framing Plan  
189.02 11/15/70   S-09   As-Built Structural D Parking: Fourth Level Framing Plan  
189.02 05/20/69   S-10     Structural D Parking: Fifth Level Framing Plan Sections, Roof Landing (Future Fifth Floor) Plans
189.02 05/20/69   S-11     Structural D Stair Sections & Details  
189.02 05/20/69   S-12     Structural D Stair Sections & Details Plan-Section, Elevation
189.02 05/20/69   S-13     Structural D Wall Sections & Details  
189.02 05/20/69   S-14     Structural D Wall Elevations & Details  
189.02 05/20/69   S-15     Structural D Joist Schedule Typical Joist Section
189.02 05/20/69   S-16     Structural D Joist Schedule  
189.02 05/20/69   S-17     Structural D Beam, Slab & Footing Schedules  
189.02 05/20/69   S-18     Structural D Column Schedule & Details Column At Floor, Typical Rebar Pocket, Mat Footing Detail, Square & Wall Columns At Roof, Floor & Footings
189.02 05/20/69   S-19     Structural D Column Slab Schedule & Details Typical Column Slab Plan, Slab Section, Slab Reinforcing, Depressed Slab Detail, Sections
189.02 11/15/70   S-20   As-Built Structural D Footing Details Mat Footing Details, Footing Sections. Mat Footing Details: Plan Of Top & Bottom Reinforcing
Size Legend: A = 9"x12", B = 12"x18", C =18"x24", D = 24"x36", E = 30"x42", F= 36"x48"