Facilities Remodel Drawings
|
||||||||||
Owner/Architects: PSU Facilities |
||||||||||
| Block/ Project | Date | Sheet Type | Sheet # | Sheet | Drawing Kind | Drawing Type | Size | Drawing Name/Description | Notes | |
| 189R | 01/17/64 | R-01 | B | Remodeling Mail Room In Warehouse | Site Plan, New Sash-Wall Section, Head & Jamb | |||||
| 189R | 03/25/71 | R-02 | A | Additional Office To Be Known As 302P | Architectural & Mechanical-Electrical Plans | |||||
| 189R | 11/03/71 | R-03 | B | Key Shop | Floor Plan, Mechanical-Electrical Plan, Cabinet Elevations & Details | |||||
| 189R | 11/11/71 | R-04 | A | Office Remodel, Institutional Research | New Special Lighting, New Doors, New Supply | |||||
| 189R | 03/03/72 | R-05 | B | New Office, Warehouse | Mechanical, Electrical & Architectural Plans | |||||
| 189R | 08/15/72 | R-06 | D | Shop Expansion | Basement Level, First Floor Shops & Warehouse | |||||
| 189R | 12/21/72 | R-07 | A | Mail Room Office Enclosure | Section, Horizontal Section At Counter | |||||
| 189R | 01/12/73 | R-08 | A | New Locker Room 101 | Room Plan, New Door & Concrete Block Wall 103, 105 | |||||
| 189R | 01/25/73 | R-09 | A | New Offices 302Q & 302S | Construction & Electrical Notes | |||||
| 189R | 10/23/73 | R-10 | B | Suspended Ceiling, Third Floor Stair Landing | Grid & Panels, Drainage | |||||
| 189R | 01/04/74 | R-11 | B | Mail Room Insulation Details | Floor Plans, N, E & W Walls. Mechanical & Electrical Notes | |||||
| 189R | 03/13/74 | R-12 | B | Mechanical Shop Office & Lunch Room 124, 125 | Finish Schedule | |||||
| 189R | 03/13/74 | R-12A | B | Mechanical Shop Office & Lunch Room | Electrical & Mechanical | |||||
| 189R | 08/20/74 | R-13 | B | New Wall, Parking Area - Basement | Elevation Of East Side | |||||
| 189R | 07/17/74 | R-14 | D | Warehouse/Stores Area Remodel | East Elevation, Remove Walls, New Window, Electrical Alterations | |||||
| 189R | 10/19/77 | R-15 | A | Third Floor Remodel | New Doors, Remove Shelving & Windows | |||||
| 189R | 04/30/81 | R-16 | A | Shop Remodel | Storage, Office, Lunch, New Relites | |||||
| 189R | 03/01/85 | R-17 | A | Sign Shop 1D | Existing & Remodel Plans | |||||
| 189R | 07/23/87 | R-18 | D | Warehouse Loading Dock Doors | Section Of Rolling Door Header, Main Door Section Of Jamb, Column Section, New Doors At Loading Dock Plan, North Elevation Doors At Loading Dock | |||||
| 189R | 12/01/88 | R-19 | B | Second Floor Conference Room Remodel 202V | Floor Plans, Elevations | |||||
| 189R | 12/01/88 | R-20 | B | Second Floor Conference Room Remodel 202V | Rendered Elevations | |||||
| 189R | 03/30/89 | R-21 | B | Second Floor Conference Room Remodel 202V | Floor Plan, Reflected Ceiling Plan, Table Tops, Table Edge Detail, Elevation At Coffee Bar | |||||
| 189R | 12/07/90 | R-22 | B | Room 101 Remodel | Plan | |||||
| 189R | 01/01/89 | R-23 | B | Office Remodel, Second Floor, Phase 1 | Floor & Reflected Ceiling Plans | |||||
| 189R | 12/16/91 | R-24 | A | Physical Plant Office Remodel (Walls) 209 210 | Stud Walls, Relocate Phone Outlet | |||||
| 189R | 01/23/92 | R-25 | A | Office Remodel C204 | Cabinet Elevation & Section | |||||
| 189R | 05/01/92 | R-26 | B | Warehouse/Stores Relocation | ||||||
| 189R | 09/08/92 | R-27 | A | Sign Shop Remodel, Rooms 1D & 1 | Floor Plan, Ceiling Plan, Finish Schedule | |||||
| 189R | 12/02/92 | R-28 | B | Computer Work Room 202G | Floor & Reflected Ceiling Plans, Furniture | |||||
| 189R | 02/20/93 | R-29 | B | Room 202J Drafting Area | Partial Plan, Elevation, Section, Bracket Detail | |||||
| 189R | 09/29/89 | R-30 | B | Reception Area Remodel | Floor Plan/Reflected Ceiling Plan | |||||
| 189R | 01/20/93 | R-31 | B | Furniture Layout, Refrigeration & Electrical Shops, Basement | Work Bench, Grinder, Peg Board Wall, Computer Desk, Storage | |||||
| 189R | 08/11/99 | R-32 | A | USB Exit Corridor and Offices | Title Sheet | |||||
| 189R | 08/11/99 | R-33 | A | USB Exit Corridor and Offices | Fire Life Safety Plans | |||||
| 189R | 08/11/99 | R-34 | As-Built | A | USB Exit Corridor and Offices | Fire Life Safety Plans | ||||
| 189R | 08/11/99 | R-35 | As-Built | A | USB Exit Corridor and Offices | Demolition Plan | ||||
| 189R | 08/11/99 | R-36 | As-Built | A | USB Exit Corridor and Offices | Floor Plan | ||||
| 189R | 08/11/99 | R-37 | As-Built | A | USB Exit Corridor and Offices | Mechanical, Electrical | ||||
| 189R | 08/11/99 | R-38 | As-Built | A | Clean Copy Delivery Access Door | Schematic Plan | ||||
| Size Legend: A = 9"x12", B = 12"x18", C =18"x24", D = 24"x36", E = 30"x42", F= 36"x48" |