Drawing Archives
Block 190: Portland Schools Building
Project 190.03: Professional Schools Building Phase II 1986-1989
List of Contents:
Consultants:
YOST-GRUBE-HALL, ARCH; KPFF CONSULTING ENGINEERS, STRUCT; TIMMER ASSOCIATES, ME; INTERFACE ENGINEERING, EE; WALKER & MACY, LANDSCAPE; LERCH, BATES & ASSOC., ELEVATORS; TOWNE, RICHARDS & CHAUDIERE, ACOUSTICAL
- 02.1 - EXISTING SITE
PLAN AS-BUILT
- 02.2 - SITE PLAN AS-BUILT
- 02.3 - PLAZA PLAN & DETAILS AS-BUILT
- 02.4 - SITE DETAILS
AS-BUILT
- 04.1 - FIRST & SECOND
FLOOR PLANS AS-BUILT
- 04.2 - THIRD & FOURTH
FLOOR PLANS AS-BUILT
- 04.3 - FIFTH & SIXTH
FLOOR PLANS AS-BUILT
- 04.4 - ROOF PLAN AS-BUILT
- 05.1 - NORTH & EAST
ELEVATIONS AS-BUILT
- 05.2 - SOUTH & WEST
& PARTIAL ELEVATIONS AS-BUILT
- 05.3 - BUILDING CROSS
SECTIONS AS-BUILT
- 05.4 - WALL SECTIONS
AS-BUILT
- 05.5 - WALL SECTIONS
AS-BUILT
- 06.1 - EXTERIOR DETAILS
AS-BUILT
- 06.2 - EXTERIOR DETAILS
AS-BUILT
- 06.3 - EXTERIOR DETAILS
AS-BUILT
- 06.4 - EXTERIOR DETAILS
AS-BUILT
- 06.5 - EXTERIOR DETAILS
AS-BUILT
- 07.1 - EXTERIOR DETAILS
AS-BUILT
- 07.2 - PHASE I WORK:
FLOORS 1 THROUGH 6 AS-BUILT
- 07.3 - PHASE I WORK:
TRUSS & PARTITION REPAIR AS-BUILT
- 08.1 - FIRST & SECOND
FLOOR CEILING PLANS AS-BUILT
- 08.2 - THIRD & FOURTH
CEILING PLANS AS-BUILT
- 08.3 - FIFTH & SIXTH
FLOOR CEILING PLANS AS-BUILT
- 08.4 - CEILING DETAILS
AS-BUILT
- 09.01 - AUDITORIUM
PLAN & DETAILS AS-BUILT
- 09.02 - FIRST FLOOR
CASE STUDY PLANS & ELEVATIONS AS-BUILT
- 09.03 - EXECUTIVE CASE
STUDY PLAN & DETAILS AS-BUILT
- 09.04 - STUDENT CASE
STUDY PLAN & DETAILS AS-BUILT
- 09.05 - INTERIOR DETAILS
AS-BUILT
- 09.06 - INTERIOR DETAILS
AS-BUILT
- 09.07 - INTERIOR DETAILS
AS-BUILT
- 09.10 - TOILET PLANS & DETAILS AS-BUILT
- 10.1 - INTERIOR ELEVATIONS
AS-BUILT
- 10.2 - INTERIOR ELEVATIONS & DETAILS AS-BUILT
- 10.3 - PARTITION & INTERIOR
FRAME DETAILS AS-BUILT
- 10.4 - DOOR FRAME & MISCELLANEOUS DETAILS AS-BUILT
- 11.1 - STAIR DETAILS
AS-BUILT
- 12.1 - FIRST & SECOND
FLOOR PLANS: CASE WORK, FURNISHINGS & EQUIPMENT
- 12.2 - THIRD & FOURTH
FLOOR PLANS: CASE WORK, FURNISHINGS & EQUIPMENT
- 12.3 - FIFTH & SIXTH
FLOOR PLANS: CASE WORK, FURNISHINGS & EQUIPMENT
- 12.4 - DETAILS: CASEWORK & FURNISHINGS AS-BUILT
- 12.5 - DETAILS: CASEWORK & FURNISHINGS AS-BUILT
- 12.6 - PODIUMS (FIXED & MOVEABLE) & RECEPTION DESK AS-BUILT
- 12.7 - SIGNAGE DETAILS
AS-BUILT
- 14.1 - ELEVATOR DETAILS
AS-BUILT
- 15.01 - SITE PLAN,
BRIDGE PLAN, LEGEND AS-BUILT
- 15.02 - FIRST & SECOND
FLOOR PLANS, PLUMBING AS-BUILT
- 15.03 - THIRD & FOURTH
FLOOR PLANS, PLUMBING AS-BUILT
- 15.04 - FIFTH & SIXTH
FLOOR PLANS, PLUMBING AS-BUILT
- 15.05 - FIRST & SECOND
FLOOR PLANS, HVAC AS-BUILT
- 15.06 - THIRD & FOURTH
FLOOR PLANS, HVAC AS-BUILT
- 15.07 - FIFTH & SIXTH
FLOOR PLANS, HVAC AS-BUILT
- 15.08 - MECHANICAL
ROOF PLAN, SECTION & DIAGRAM AS-BUILT
- 15.09 - DETAILS, DIAGRAMS & SCHEDULES, PLUMBING AS-BUILT
- 15.10 - DETAILS, HVAC
AS-BUILT
- 15.11 - DETAILS & SCHEDULES,
HVAC AS-BUILT
- 15.12 - CONTROLS AS-BUILT
- 17.1 - SOUND REINFORCING
SYSTEM AS-BUILT
- 17.2 - SOUND REINFORCING
SYSTEM AS-BUILT
- AB01 - AS-BUILT DETAILS
- AB02 - AS-BUILT DETAILS
- AB03 - AS-BUILT DETAILS
- AB04 - AS-BUILT DETAILS
- AB05 - AS-BUILT DETAILS
- AB06 - AS-BUILT DETAILS
- AB07 - AS-BUILT DETAILS
- AB08 - AS-BUILT DETAILS
- AB09 - DIMENSION CLARIFICATION & REVISIONS: MARKING BOARDS & WOOD HEA
- AB10 - DIMENSION CLARIFICATION & REVISIONS: MARKING BOARDS AS-BUILT
- B.1 - BRIDGE DETAILS
AS-BUILT
- B.2 - HARRISON BRIDGE
RAIL & BRICK COLUMN AS-BUILT
- CS - COVER SHEET AS-BUILT
- E-11 - POWER/SIGNAL
LIGHTING & TV CONDUIT PLAN
- E01 - SITE PLAN, ELECTRICAL
- E02 - FIRST & SECOND
FLOOR PLANS: LIGHTING AS-BUILT
- E03 - THIRD & FOURTH
FLOOR PLANS: LIGHTING AS-BUILT
- E04 - FIFTH & SIXTH FLOOR
PLANS: LIGHTING AS-BUILT
- E05 - FIRST & SECOND
FLOOR PLANS: POWER & SIGNAL AS-BUILT
- E06 - THIRD & FOURTH
FLOOR PLANS: POWER & SIGNAL AS-BUILT
- E07 - FIFTH & SIXTH FLOOR
PLANS: POWER & SIGNAL AS-BUILT
- E08 - ROOF PLAN: ELECTRICAL & PANEL SCHEDULES AS-BUILT
- E09 - ELECTRICAL DETAILS
AS-BUILT
- E1 - SHAW WEST CO. LOW
VOLTAGE RELAY EQUIP RISER DIAGRAM
- E10 - RISER DIAGRAMS
AS-BUILT
- E2 - SHAW WEST CO. LOW
VOLTAGE RELAY WIRING DIAGRAMS 1979
- F-1 - FURNITURE INSTALLATION
PLAN
- F-2 - FURNITURE INSTALLATION
PLAN
- F-3 - FURNITURE INSTALLATION
PLAN
- F-4 - FURNITURE INSTALLATION
PLAN, 1ST & 2ND FLOORS
- F-5 - FURNITURE INSTALLATION
PLAN, 3RD & 4TH FLOORS
- F-6 - FURNITURE INSTALLATION
PLAN, 5TH & 6TH FLOORS
- L1 - PLANTING PLAN AS-BUILT
- L2 - IRRIGATION PLAN AS-BUILT
- P-1 - PANEL INSTALLATION
PLAN
- P-2 - PANEL INSTALLATION
PLAN
- P-3 - PANEL INSTALLATION
PLAN
- S1.1 - GENERAL NOTES,
DRAWING NOTES, DRAWING INDEX AS-BUILT
- S2.1 - FOUNDATION, FIRST & SECOND FLOOR, FRAMING PLANS AS-BUILT
- S2.2 - THIRD & FOURTH
FLOOR FRAMING PLANS AS-BUILT
- S2.3 - FIFTH & SIXTH
FLOOR FRAMING PLANS AS-BUILT
- S2.4 - ROOF FRAMING
PLANS AS-BUILT
- S4.1 - POST TENSIONING
SCHEDULE AS-BUILT
- S4.2 - COLUMN & BEAM
SCHEDULES & DETAILS AS-BUILT
- S5.1 - TYPICAL CONCRETE
DETAILS & SECTIONS AS-BUILT
- S5.2 - P/T CONCRETE
DETAILS & SECTIONS AS-BUILT
- S6.1 - MISCELLANEOUS
DETAILS & SECTIONS AS-BUILT
- S7.1 - STAIR DETAILS & SECTIONS AS-BUILT
- S8.1 - BRIDGE DETAILS & SECTIONS AS-BUILT