Drawing Information


PARTIAL FIRST FLOOR PLANT DETAILS AS-BUILT

Block:198.09 Drawing:M2
Date: 10/31/88
Notes:
EQUIPMENT SCHEDULE, LEGEND, CONDENSATE PUMP SCHEMATIC, S MECHANICAL ROOM MAIN DRIP ADDITION, BOILER RM MAIN DRIP ADDITION
Size: D: 24 x 36
Consultant Drawing
As-Built
Not-on-CAD