Block 198: Shattuck Hall Drawing Archives
Project 198M: Facilties Mechanical Drawings
List of Contents:
- M-01 - TELEPHONE CABLE
CONDUIT
- M-02 - COMPUTER CENTER
MECHANICAL PLAN
- M-03 - COMPUTER CENTER
MECHANICAL PLAN
- M-04 - CSSO HEATING &
AIR CONDITIONING REMODEL
- M-05 - CSSO/COMPUTER
CENTER CLOSED CIRCUIT COOLING TOWER INSTALLATION
- M-06 - BOILER FUEL PUMP
REPLACEMENT
- M-08 - BOILER FEED WATER
METER & CORROSION COUPON DETAIL
- M-09 - COMPUTER CENTER
AIR CONDITIONING PLAN
- M-11 - COMPUTER CENTER
AIR CONDITIONING PIPING DIAGRAM (8/14/79?)
- M-12 - COMPUTER CENTER
MEETING ROOM VENTILATION
- M-13 - PROPOSED STEAM
LINES (6/27/?)
- M-14 - VENTILATION DETAILS,
ROOM 212 REMODEL
- M-16 - CW SCHEMATIC 1983
NEUMAN AS-BUILT
- M-17 - AHU-1 112 REMODEL
- M-18 - AHU-1 112 REMODEL
- M-20 - CSSO DUCT HEATERS
- M-22 - DRAIN LINE MODIFICATION
- M-23 - ROOM 112 REMODEL
AHU-1