Block 199: Neuberger Hall Drawing Archives
Project 199.02R: South Park Hall Addition Revisions 1966-1968 Job #6501
Consultants:
WOLFF, ZIMMER, GUNSUL, FRASCA, ARCH.; COOPER & ROSE, STRUCT; THOMAS TAYLOR, ME; GRANT KELLEY & ASSOC., EE
List of Contents:
- R-04 - REVISED STAIR
NO. 11
- R-05 - REVISED ENTRANCE
HANDRAILS
- R-06 - REVISED SECOND
FLOOR BALCONY
- R-07 - PROJECT SIGN
- R-08 - PROJECT SIGN
- R-09 - DUTCH DOOR DETAIL
- R-10 - DOOR DETAIL
MODIFICATION
- R-11 - LOCATION OF
FIRE ANNUNCIATOR, HOSE CABINET & SIGNAL LIGHTS C12
- R-12 - GRADUATE STUDIES
OFFICE REVISED CLASSROOMS 121 123
- R-13 - REVISION TO
PHOTO LAB, ROOM 217
- R-14 - UNDER FLOOR
DUCT FIRE PROOFING
- R-15 - DEAN OF FACULTY
OFFICES, REVISED; 321 322 323 325 328 329 331
- R-16 - REVISED EXISTING
CORRIDOR WALL, SECOND FLOOR, FOR LOCKERS
- R-17 - REVISIONS TO
ADMISSIONS OFFICE 125 & SUITE 136
- R-18 - REVISION TO
CLASSROOM 302
- R-19 - WICKET: NORTH
WALL ROOM 63
- R-20 - REVISED WICKET,
DRAWING ROOM 61
- R-21 - REVISED COUNTER
AT SECRETARY, ADMISSIONS OFFICE
- RE-03 - REVISION TO
LIGHTING (BASEMENT)
- RE-04 - REVISION TO
LIGHTING (BASEMENT)
- RE-05 - REVISION TO
POWER & SIGNAL (BASEMENT)
- RE-06 - REVISION TO
POWER & SIGNAL (BASEMENT)
- RE-07 - REVISION TO
POWER & SIGNAL (BASEMENT)
- RE-08 - REVISION TO
POWER & SIGNAL (BASEMENT)
- RE-09 - REVISION TO
LIGHTING (GROUND FLOOR)
- RE-10 - REVISION TO
LIGHTING (GROUND FLOOR)
- RE-11 - REVISION TO
LIGHTING (GROUND FLOOR)
- RE-12 - REVISION TO
LIGHTING (THIRD FLOOR)
- RE-13 - REVISION TO
LIGHTING (FOURTH FLOOR)
- RE-14 - REVISION TO
LIGHTING (FOURTH FLOOR)
- RE-15 - REVISION,
SECOND FLOOR BALCONY
- RE-16 - REVISION TO
TV SYSTEM
- RE-16A - REVISION
TO TV SYSTEM
- RE-16B - REVISION
TO TV SYSTEM
- RE-17 - ELECTRICAL
TRENCH AT VAULT
- RE-18 - GRADUATE STUDIES
OFFICE REVISED CLASSROOMS 121 123
- RE-19 - POWER & SIGNAL
REVISIONS (ROOM 48)
- RE-20 - PHOTO LAB
REVISION 217
- RE-21 - DEAN OF FACULTY
OFFICES REVISION, THIRD FLOOR
- RE-22 - BACKING FOR
LIGHT FIXTURES, TYPE "V"
- RE-23 - REVISED LIGHTING
LAYOUT FOR VAULT 113
- RE-24 - REVISION TO
LIGHTING LAYOUT 104 105
- RE-25 - REVISION TO
ADMISSIONS OFFICE & 113, LIGHTS
- RE-26 - REVISIONS
TO ADMISSIONS OFFICE & 117, POWER
- RE-27 - ADDITIONAL
LIGHTING STAIRS 1 & 2
- RE-28 - PARTIAL GROUND
FLOOR PLAN LIGHTING REVISIONS 118
- RM-02 - CORRECTION
OF RISER LOCATION
- RM-03 - DUCT WORK
REVISION AT SECOND FLOOR BALCONY
- RM-04 - GRADUATE STUDIES
OFFICE REVISED CLASSROOMS 121 123
- RM-05A - REVISION
TO PHOTO LAB PLUMBING
- RM-05B - REVISION
TO PHOTO LAB H & V
- RM-06 - REVISED DEPT
OFFICE SUITE TO DEAN OF FACULTY OFFICES THIRD FLO
- RM-07 - REVISION TO
ROOMS 438 & 440
- RM-08 - REVISED MECHANICAL
LAYOUT FOR VAULT 113
- RM-09 - REVISED FLEX
CONNECTION FOR UNITRANE UNITS
- RM-10 - REVISION TO
CHILLED WATER COIL DIAGRAM
- RM-11 - REVISED DUCTWORK
LOCATIONS AT THIRD FLOOR
- RM-12 - REVISION TO
ADMISSIONS OFFICE & CLASSROOM 117 (345 346)
- RM-13 - REVISED DUCTWORK,
EXISTING CORRIDOR
- RM-14 - RELOCATION
OF MIXING BOX, SECOND FLOOR
- RS-1 - REVISED PLAN
ROOMS 48 49 50
- RS-2 - DIMENSIONAL
CLARIFICATION AT LINE 6
- RS-3 - REVISION OF
PIPE SHAFT AT NW CORNER
- RS-4 - CLARIFICATION
DETAILS AT EXISTING RAMP
- RS-5 - SIDELIGHT CURTAIN
RODS
- SUP-1 - REVISED PLAN
ROOMS 48 49 50
- SUP-2 - VALANCE AT
CORRIDOR 244
- SUP-3 - SOFFITS AT
CORRIDOR CEILINGS; REVISED DETAIL, PARAPET AT BRICK
- SUP-E-1 - ENCLOSURE
FOR EMERGENCY MAIN BREAKERS
- SUP-E-2 - ALUMINUM
PLASTER FRAME