Block 201 Cramer Hall Drawing Archives
State Hall, SE Unit 1957-1958
Architectural Consultants: Lawrence, Tucker, & Wallman
Structural Engineering Consultants: Miles Cooper & Rowland Rose
Mechanical Engineering Consultants: J. Donald Kroeker & Associates
Electrical Engineering Consultants: Grant Kelley & Associates
Block/ Project Date Sheet Type Sheet # Sheet Drawing Kind Drawing Type Size Drawing Name/Description Notes
201.02     00         Schedule of DRAWINGS  
201.02 07/16/57   01       D PLOT Plan  
201.02 05/22/58   02       D BASEMENT Floor Plan Ceiling Plan
201.02 10/23/58   03       D First Floor Plan Ceiling Plan, BOILER Room MEZZANINE Framing
201.02 05/22/58   04       D SECOND Floor Plan Ceiling Plan, PLASTER RECESS FOR RECESSED FIXTURES IN FIREPROOFING PLASTER
201.02 05/22/58   05       D THIRD Floor Plan Ceiling Plan
201.02 10/22/58   06       D FOURTH Floor Plan Ceiling Plan
201.02 03/27/58   07       D MONITOR & Roof Plans  
201.02 09/18/57   08       D MONITOR & Roof Details RETURN AIR DUCT HOUSING, JOINT BETWEEN HIGH & LOW MONITOR PARTS, INTERIOR MONITOR PARTITION, EXHAUST Shaft, LOUVER, Roof DRAIN, CHIMNEY VENT, MECHANICAL DUCT OPENINGS
201.02 05/19/58   09       D SOUTH & EAST Elevations  
201.02 07/29/57   10       D NORTH & WEST Elevations  
201.02 05/29/58   11       D Sections S-S & T-T CORRIDORS, CORRIDOR Elevations
201.02 05/26/58   12       D Sections V-V & W-W CORRIDOR Elevations LOOKING S & E
201.02 05/26/58   13       D WALL Sections X-X  
201.02 05/26/58   14       D WALL Sections Y-Y  
201.02 05/26/58   15       D Sections Z-Z & R-R Elevation of EXHAUST Shaft at BOILER RM, UNISTRUT Ceiling Detail
201.02 05/26/58   16       D TUNNEL Plan & Sections BASEMENT 1ST 2ND 3RD 4TH Floor, Roof
201.02 05/26/58   17       D Stair "D" Plans  
201.02 05/26/58   18       D Stair "D" Sections  
201.02 05/26/58   19       D Stair "D" Details WINDOW Details, WALL BRACKET FOR HANDRAIL, POST Details
201.02 05/26/58   20       D Stair "E" BASEMENT TO FIRST Floors RAIL Details, CONNECTION at CONCRETE WALL
201.02 10/21/58   21       D Stair "E" FIRST TO FOURTH Floors Stair & HANDRAIL Details
201.02 05/29/58   22       D CHIMNEY, ELEVATOR & MISCELLANEOUS SHAFTS SECTION THRU ELEVATOR Shaft & CHIMNEY, THRU VENTS at 282A & 282B. EXHAUST VENT at Columns
201.02 05/28/58   23       D LECTURE Room 90 Details DIAGONAL SECTION, DEVELOPED Elevations, COUNTER PROJECTION Room 90A
201.02 05/28/58   24       D LECTURE Rooms 186, 286, 386, 196, 296 & 396 Details DIAGONAL SECTION, DEVELOPED LECTURE Room Elevations
201.02 10/24/58   25       D TOILET Room Details TOILET WALL Elevations, SHELF Details, JANITOR'S SINK, WICKET WINDOW, BASEMENT LOCKER RM
201.02 03/31/58   26       D EXTERIOR GRID Details WINDOW Schedule, Elevations, Details, MULLION
201.02 05/31/58   27       D MISCELLANEOUS EXTERIOR Details LOUVER Details, CORNICES
201.02 10/30/58   28       D DOOR & FRAME Details SLIDING & EXTERIOR DOOR Details, DOOR TYPES, DISPLAY CASES, JAMB, HEAD, MULLION, TRANSOM BAR
201.02 10/27/58   29       D PARTITION & CASE Details SORTING TABLE IN MAIL RM 190. STORAGE WALL & CABINET 484. LECTURE TABLE Details 90 186 286 386
201.02 07/16/57   30       D CHALKBOARD & MISCELLANEOUS Details LOCKER RECESS, SLIDING CHALKBOARD, BULLETING BOARD Elevation
201.02 12/17/57   D-02       D REVISION TO SMOKE TOWER PERIMETER MEMBRANE FLASHING, LADDER Details, GRATING at Roof
201.02 12/17/57   D-08       B ALUMINUM GRID WALL Details END CLOSER Detail, GRAIN WITH VERTICAL MEMBER
201.02 02/17/58   D-11       B ENTRANCE Details Elevation, Stair "D" ENTRY, Stair "E" ENTRY, ENTRY 150
201.02 01/21/58   D-13       B ADDED SUPPORT BOILER Room MEZZANINE MEZZANINE Plan, Elevation A & B, COLUMN Detail, TYPICAL HANDRAIL
201.02 04/04/58   D-16         ADDITIONAL Framing FOR BRIDGE Stair CORRIDOR, Stair WALL, POCKET LOCATIONS
201.02 02/20/58   D-17       D Stair "D" SUPPLEMENTARY Details Sections, FULL SIZE FINISH
201.02 03/06/58   D-20       B REVISED ANCHOR Details DOORS A & B, Stair "E". DOORS 32B-C, 88C, 90M, 182C, 282C, 382C, 482C
201.02     D-23       B REVISIONS BETWEEN Columns K & L FOR BRIDGE TYPICAL Plan, SECTION A-A, JAMB STEEL Detail
201.02 05/05/58   D-25       B REVISED SOUTH WALL LOUVERS WINDOW "F", EAST & WEST LOUVERS
201.02 06/09/58   D-26       D REVISIONS TO Room 136 Ceiling Plan, Plan at WINDOW & FIRST Floor
201.02     D-31       D ADDITIONAL Roof Details  
201.02 11/05/58   D-34       D LOCKER NUMBERING DIAGRAMS  
201.02 09/24/58   D-36       D REVISION TO THIRD Floor MECHANICAL & ELETRICAL Plans, GENERAL WORK, Reflected Ceiling Plan
201.02 10/06/58   D-38       B REVISION TO MAIL Room 190 Plan, Elevation, Detail JOINT HEAD & SILL, EXTENDED FRAME Details
201.02 12/30/58   D-39       B REVISION TO CASEWORK Room 90A NORTH WALL Elevation, Sections, SE WALL
201.02 05/29/58   DE-3       B Floor Plan Room 136 FIXTURE TYPES, NOTES
201.02 09/10/58   DE-4         PARTIAL BASEMENT Floor Plan & PARTIAL RISER DIAGRAM  
201.02     DE-4A         PARTIAL BASEMENT Floor Plan & PARTIAL RISER DIAGRAM GRANT KELLEY & ASSOC.
201.02     DM-1       A DIAGRAM of OIL STORAGE TANK INSTALLATION  
201.02 01/31/58   DM-2       A VENTILATION, OFFICE ADDITION TO BOILER Room PART, BASEMENT Plan
201.02 05/02/58   DM-3         PART BASEMENT Floor Plan  
201.02 05/02/58   DM-4       A REVISION FOR Rooms 328, 336 & 338 PART THIRD, Floor Plan
201.02 05/21/58   DM-5       A PART FIRST Floor Plan Room 136 "VOID"  
201.02     DM-6         VACUUM PUMP RELOCATION Room SB-00 PART FOUNDATION Plan, PART BASEMENT Plan, PART BOILER Room PIPING DIAGRAM
201.02 06/02/58   DM-7       A SECTION A, PART SECOND & THIRD Floor Plan  
201.02 07/01/58   DM-8         REVISED DUCTS IN Room 136 PART FIRST Floor, TYPICAL CUSHION HEAD
201.02     DM-9       A TYPICAL SECTION THRU DUCT SPACE at SOUTH END of Room 136  
201.02     DM-10         ADDITIONAL SPRINKLER PIPING IN BASEMENT PART BOILER Room, Plan
201.02 09/09/58   DM-11       A LAVATORY FOR Room 336  
201.02 08/05/59   E-01   As-Built   D BASEMENT Floor Plan LECTURE Room 90 RECEPTACLES, SIGNAL & POWER, OIL BURNER CONTROL PANEL NOTES, Detail of PANEL "2-BC" & CONTROL BOARD
201.02 08/05/59   E-02   As-Built   D First Floor Plan  
201.02 08/05/59   E-03   As-Built   D SECOND & THIRD Floor Plan DIAGRAM of CONDUIT & OUTLETS FOR TELEVISION SYSTEM
201.02 08/05/59   E-04   As-Built   D FOURTH Floor Plan FIRE ALARM SYSTEM RISER DIAGRAM & CODE SCHEME
201.02 08/05/59   E-05   As-Built   D MONITOR & Roof Plans WIRING DIAGRAM of FIRE ALARM VENT FAN CUT OFF CONTROL, Detail of PANEL "2-5A" & ASSOCIATED CONTROL BOARD
201.02 08/05/59   E-06   As-Built   D PLOT Plan & Details TUNNEL SB-10 & SECTION, SUB-BASEMENT RM at SW Corner, TELEPHONE EQUIPMENT RM, Detail of TYPICAL FIXTURE REMODEL IN RM 53, Plan of TUNNELS, Schedule of CONDUITS IN UTILITY TUNNEL B-02
201.02 08/05/59   E-07   As-Built   D RISER DIAGRAM PANEL Schedule, Schedule of BREAKERS IN SWITCHBOARD, METERING IN VAULT AREA
201.02 10/30/58   F-01       D Schedules: BASEMENT Floor Room & Stair FINISH, DOOR, FRAME & HARDWARE, ABBREVIATIONS & SYMBOLS
201.02 10/30/58   F-02       D Schedules: FIRST Floor Room & Stair FINISH, DOOR, FRAME & HARDWARE, ABBREVIATIONS & SYMBOLS
201.02 10/30/58   F-03       D Schedules: SECOND Floor Room & Stair FINISH, DOOR, FRAME & HARDWARE, ABBREVIATIONS & SYMBOLS
201.02 10/30/58   F-04       D Schedules: THIRD Floor Room & Stair FINISH, DOOR, FRAME & HARDWARE, ABBREVIATIONS & SYMBOLS
201.02 10/30/58   F-05       D Schedules: FOURTH Floor DOOR & Stair FINISH, DOOR, FRAME & HARDWARE, ABBREVIATIONS & SYMBOLS
201.02 03/31/58   F-06       D Schedules MONITOR Room & Stair FINISH, DOOR, FRAME & HARDWARE, ABBREVIATIONS & SYMBOLS
201.02 06/15/59   M-01   As-Built   D SITE Plan & Details TUNNEL PIPING Details, SEWER UNDER TUNNEL, OIL PIPING CONNECTION TO TANK
201.02 06/15/59   M-02   As-Built   D FOUNDATION & BASEMENT Plan  
201.02 06/15/59   M-03   As-Built   D FIRST & SECOND Floor Plan  
201.02 06/15/59   M-04   As-Built   D THIRD & FOURTH Floor Plan  
201.02 05/15/59   M-05   As-Built   D Penthouse Plan & Details Sections, STEAM EXHAUST DISCHARGE THRU Roof
201.02 06/15/59   M-06   As-Built   D BOILER Room Plan & Details  
201.02 06/15/59   M-07   As-Built   D BOILER Room Sections & Detail BOILER RM SECTION, ONE-LINE DIAGRAM of OIL BURNING SYSTEM CONTROL, BOILER RM PIPING DIAGRAM, BREECHING EXPANSION JOINT, SAIL SWITCH Detail
201.02 06/15/59   M-08   As-Built   D SUPPLY Shaft Sections INTERIOR & EXTERIOR ZONES
201.02 06/15/59   M-09   As-Built   D RETURN Shaft Sections TOILET EXHAUST, EXTERIOR ZONE SUPPLY PLENUM Plans
201.02 06/15/59   M-10   As-Built   D PIPING DIAGRAM & Details PLUMBING RISER DIAGRAM, TYPICAL CV & CULT PIPING DIAGRAM, FLOAT & THERMOSTATIC STEAM TRAP ASSEMBLY, FIREBOX Details
201.02 06/15/59   M-11   As-Built   D Details DUCT CONSTRUCTION, Ceiling DIFFUSER SUPPLY DUCT, CORRIDOR Ceiling DIFFUSER, MIXING DAMPER SWIVEL JOINT, WR GRILLE DAMPER, RETURN SOFFIT, PLENUM TAKEOFF SPLITTER, PIPING THRU PLENUM WALLS & BAFFLES, Details of CONTROL BOARD
201.02 06/15/59   M-12   As-Built   D ALTERNATES Sections of OIL HEATING TANK, BOILER FEED SYSTEM PIPING
201.02 08/06/57   MA-2-1       A Sections of OIL HEATING TANK LONGITUDINAL & CROSS Sections
201.02 05/27/58   S-01       D COLUMN Schedule & Details GENERAL NOTES, COLUMN TOP & SPLICE, BASE PLATE, PLASTER & CONCRETE FIREPROOFED Columns, INTERIOR COLUMN FOOTING
201.02 10/04/57   S-02       D BASEMENT & FOUNDATION Details LIFTING HOLE PLUG FOR REMOVABLE SLABS
201.02 09/19/57   S-03       D BASEMENT Details TUNNEL Details & SECTION
201.02 07/16/57   S-04       D STEEL Details CONNECTIONS: BEAM TO MULLION, BEAM TO COLUMN, BEAM TO BEAM, MULLION TO BEAM, BEAM & GIRDER TO COLUMN
201.02 10/04/57   S-05       D Framing Plan, BASEMENT & FOUNDATION SLAB Schedule
201.02 09/19/57   S-06       D Framing Plan, FIRST Floor SLAB Schedule, BEAM Schedule
201.02 09/19/57   S-07       D Framing Plan, SECOND Floor  
201.02 09/19/57   S-08       D Framing Plan, THIRD Floor  
201.02 09/19/57   S-09       D Framing Plan, FOURTH Floor LECTURE Rooms RASIED Floor Framing Plan
201.02 04/01/58   S-10       D Framing Plan, Roof  
201.02 07/16/57   S-11       D Framing Plan, Penthouse  
201.02 07/16/57   S-12       D Framing Plans, Stair "D"  
201.02 07/16/57   S-13       D Sections, Stair "D"  
201.02 09/19/57   S-14       D Framing Plan, Stair "E" BASEMENT TO FIRST Floor  
201.02 07/16/57   S-15       D Framing Plan, Stair "E" FIRST TO FOURTH Floor  
201.02 09/19/57   S-16       D Elevations, EAST & SOUTH WALL REINFORCING Schedule
201.02 07/16/57   S-17       D Elevations, NORTH & WEST  
201.02 11/12/57   SS-1       D STRUCTURAL STEEL COLUMN Schedules & Details COLUMN Schedule, GENERAL NOTES, TYPICAL PLASTER & CONCRETE FIREPROOFED Columns
201.02 05/20/57   SS-2       D STEEL Details BEAM TO MULLION, BEAM TO BEAM, BEAM TO GIRDER, BEAM TO COLUMN CONNECTIONS
201.02 11/12/57   SS-3       D FIRST Floor Framing Plan  
201.02 11/12/57   SS-4       D SECOND Floor Framing Plan  
201.02 11/12/57   SS-5       D THIRD Floor Framing Plan  
201.02 11/12/57   SS-6       D FOURTH Floor Framing Plan  
201.02 11/12/57   SS-7       D Roof or FUTURE FIFTH Floor Framing Plan  
201.02 11/12/57   SS-8       D Penthouse Roof Framing Plan  
201.02 05/20/57   SS-9       D Stair "E" Details W Elevation at Stair NE Corner, S Elevation at Stair NE Corner
201.02 03/29/57   X       D Bridge Connector MONTGOMERY ST Elevation, BRIDGE Elevation, N Elevation WITH SERVICE TUNNEL
201.02     X-1       D Plans & Elevations, Room 136 N, S, E & W Elevations, Reflected Ceiling Plan
Size Legend: A = 9"x12", B = 12"x18", C =18"x24", D = 24"x36", E = 30"x42", F= 36"x48"