State Hall Cooling Facilities 1960 |
||||||||||
Architectural Consultants: Lawrence, Tucker, & Wallman Mechanical Engineering Consultants: J. Donald Kroeker & Associates |
||||||||||
| Block/ Project | Date | Sheet Type | Sheet # | Sheet | Drawing Kind | Drawing Type | Size | Drawing Name/Description | Notes | |
| 201.04 | 07/01/60 | 1 | D | Part Boiler Room Plan, Roof Plan & Details | Immersion Thermostat Detail, Cooling Tower Piping Diagram & Platform, Detail of Pipe Racks on Roof, Condesener Water Piping | |||||
| 201.04 | 07/01/60 | 2 | D | Part Penthouse Plans, NW & SE State Hall & Details | Detail of Coil Drip Pans, Typical Automatic Air Vent, Piping Through Plenum Walls & Baffles | |||||
| 201.04 | 11/08/60 | DM-1 | Relocation of Piping & Equipment, Boiler Room | Chiller, Chilled Water Pump, Cooling Tower Pump, Boilers 1, 2 & 3 | ||||||
| 201.04 | 12/15/60 | DM-2 | CC-2 Installation Sketch | Part Penthouse Plan, Section A, Deflector Detail | ||||||
| Size Legend: A = 9"x12", B = 12"x18", C =18"x24", D = 24"x36", E = 30"x42", F= 36"x48" |