State Hall Additions Revisions 1968-1970 |
||||||||||
Architectural Consultants: Wolf, Zimmer, Gunsul, Frasca, Ritter Structural Engineering Consultants: Cooper & Rose |
||||||||||
| Block/ Project | Date | Sheet Type | Sheet # | Sheet | Drawing Kind | Drawing Type | Size | Drawing Name/Description | Notes | |
| 201.05R | 03/11/68 | R-01 | A | Extruded Aluminum Frame | ||||||
| 201.05R | 03/13/68 | R-02 | A | Head | ||||||
| 201.05R | 08/03/68 | R-03 | A | Revised Partial Plan Rooms 43, 44, 45 | Anthropolgy, Osteology, Special Purpose Classroom, Anthro-Serology Lab | |||||
| 201.05R | 08/05/6 | R-04 | A | Project Sign | "State Hall Additions" | |||||
| 201.05R | 09/25/68 | R-05 | A | Platform At Mechanical Shaft | Plan & Section | |||||
| 201.05R | 10/23/68 | R-06 | A | Basement Reflected Ceiling Plan | B11, B12, B13 & B14 | |||||
| 201.05R | 11/04/68 | R-07 | A | Additional Lab Furniture, Room B13 | Earth Science Cartology & General Geology, Relocate Door | |||||
| 201.05R | 11/21/68 | R-08 | A | Window Head At West Balcony, Fifth Floor | Clarification Drawing | |||||
| 201.05R | 11/27/68 | R-09 | A | Toilet Accessories Locations | Plan & Elevations. Napkin Disposal, Seat Cover Dispenser, Shelf | |||||
| 201.05R | 11/27/68 | R-09A | A | Handicapped Toilet Accessories | Elevations, Grab Rail | |||||
| 201.05R | 12/07/68 | R-10A | A | Revision To Darkroom 390 | Balance SHeet, Shelf Standards, Enlarger Location | |||||
| 201.05R | 12/07/68 | R-10B | A | Revision To Darkroom 408 | ||||||
| 201.05R | 12/10/68 | R-11 | A | Revision To Economics Department Offices 247 & 249 | ||||||
| 201.05R | 12/16/68 | R-12 | A | Revision To Offices 320 & 322 | Delete Door, Partition, Bookshelves | |||||
| 201.05R | 03/19/69 | R-13 | A | Revision To Rooms 276A, 278A & 285 | Small Groups Experimental Lab Room. Relocated Doors, Camera | |||||
| 201.05R | 03/20/69 | R-14 | A | Mechanical Vent Curb | ||||||
| 201.05R | 03/22/69 | R-15 | A | Ceiling Recess At Room 415 | Advanced Cartography: Partial Ceiling Plan, Section | |||||
| 201.05R | 04/15/69 | R-16 | A | Wicket Door At Reception Counter, Room 249 | Plan, Section At Counter | |||||
| 201.05R | 04/15/69 | R-17 | A | Additional Door At South Wall, Room 502 | Head | |||||
| 201.05R | 04/15/69 | R-18 | A | Wall Revision For Damper Access Panel, Fourth Floor | Elevation, Wall Base At Access Pane | |||||
| 201.05R | 04/21/69 | R-19 | A | Stairway To Elevated Mechanical Room; Relocation & Addition To Landing | Elevation & Plan | |||||
| 201.05R | 04/15/69 | R-20 | A | Revision of Wall To Expand Area W/Acousitc Treatment Room 275 | Head & Acoustic Trim, S & W Walls, Panel At Ceiling | |||||
| 201.05R | 04/02/69 | R-21 | A | Steel Stairway To Penthouse Roof | Connect Stringer To Landing, Connections & Landing Support, Base Plate | |||||
| 201.05R | 05/02/69 | R-22 | A | Office Unit Revision | Section, Partial Elevation, Detail At Wall | |||||
| 201.05R | 05/13/69 | R-23 | A | Existing Exhaust Pit Extension | AA Section, Elevator Shaft & Existing Stack | |||||
| 201.05R | 05/20/69 | R-24 | A | Ceiling At Corner Window Room 410 | Head & Dropped Ceiling Assembly | |||||
| 201.05R | 11/12/69 | R-26 | A | Pass Door, Office 352 & 354 | Elevation From 352, Head, Sill | |||||
| 201.05R | 01/13/70 | R-30 | A | Revised Transom Sill | Metal Stops At Transom | |||||
| 201.05R | 01/29/70 | R-31 | A | Parapet Railing | Penthouse Roof Plan, Section | |||||
| 201.05R | 03/13/70 | R-32 | A | Fireman's Ladder Support | Plan, Section | |||||
| 201.05R | 08/22/68 | RE-01 | A | Partial Ground Floor Plan Lighting Revisions 43, 44, 45, 46 & 47 | ||||||
| 201.05R | 08/22/68 | RE-01A | A | Partial Ground Floor Plan Power & Signal Revisions 43, 44, 45, 46 & 47 | ||||||
| 201.05R | 10/10/68 | RE-02 | A | Relocate Lighting At West Stair | West Stair Ground & Basement Floors | |||||
| 201.05R | 11/04/68 | RE-03 | A | Control For Pump At Well #3 | ||||||
| 201.05R | 11/04/68 | RE-04 | A | Control For Pump At Well #3 | ||||||
| 201.05R | 11/04/68 | RE-05 | A | Control For Pump At Well #3 | Elevations, "A-A", West Wall of Utility Tunnel | |||||
| 201.05R | 11/04/68 | RE-06 | A | Control For Pump At Well #3: Typical Terminal Cabinet | ||||||
| 201.05R | 11/04/68 | RE-07 | A | Addition Of Cabinet Lighting Room B03 | Partial Basement Floor Plan Revised | |||||
| 201.05R | 12/21/68 | RE-08 | A | Revisions To Darkroom 390 408 | Partial Third & Fourth Floor Plans | |||||
| 201.05R | 03/04/69 | RE-09 | A | Revisions To Economics Department Area 245, 249, 250 & 251 | Partial Second Floor Plan | |||||
| 201.05R | 12/21/68 | RE-10 | A | Revisions To Room B13 | Partial Basement Floor Plan | |||||
| 201.05R | 12/10/68 | RE-11 | A | Revisions To Offices 320 & 322 | Partial Third Floor Plan | |||||
| 201.05R | 03/25/69 | RE-12 | A | Revision To Rooms 276A, 278A & 285 | Partial Second Floor Plan | |||||
| 201.05R | 04/10/69 | RE-13 | A | Additional Mechanical Room Lighting | Partial Fifth Floor Plan | |||||
| 201.05R | 05/14/69 | RE-14 | A | Addition Of Dimming Room 280 | Partial Second Floor Plan | |||||
| 201.05R | 12/16/69 | RE-15 | A | Revised First Floor Division Head Suite | Partial First Floor Plan | |||||
| 201.05R | 03/12/68 | RM-01 | A | Condensor Pump No. 4 | Part Basement Floor Plan, Piping Diagram | |||||
| 201.05R | 03/12/68 | RM-02 | A | Piping For Aninal Cages Room 512 | Detail of Plugged Drain, Riser Diagram | |||||
| 201.05R | 08/16/68 | RM-03 | A | Addition To Pumped Sewage System | Part Basement & Ground Floor Plans 30, 32, 33 & B11 | |||||
| 201.05R | 10/14/67 | RM-04 | E | Additions & Alterations To Well Water System | Partial Riser Piping & Depth Gauge Piping Diagrams. Watertight Sleeve Detail | |||||
| 201.05R | 11/05/68 | RM-05 | A | Duct Revisions In Room B-11 | Part Basement Plan | |||||
| 201.05R | 12/23/68 | RM-06 | A | Duct Revisions In Darkroom 390 & 391 | Part Third Floor Plan | |||||
| 201.05R | 12/23/68 | RM-07 | A | Duct Revisions & Sink Addition In Darkroom 408 | Part Fourth Floor Plan | |||||
| 201.05R | 12/23/68 | RM-08 | A | Duct Revisions In Rooms 247 & 251 | Part Second Floor Plan | |||||
| 201.05R | 01/10/69 | RM-09 | A | Duct Revisions In Room 47 | Part Ground Floor Plan | |||||
| 201.05R | 02/21/69 | RM-10 | A | CUH Piping Revisions At East Stair | Part Basement & Ground Floor Plans | |||||
| 201.05R | 03/24/69 | RM-11 | A | Revisions To Air Supply Systems 276, 276A, 278, 278A, 285 & 286 | ||||||
| 201.05R | 05/08/69 | RM-12 | A | Duct Revisions In Room 409 | ||||||
| 201.05R | 05/12/69 | RM-13 | A | Addition To Boiler Room Steam Header | Elevation of Steam Header Looking North | |||||
| 201.05R | 09/12/69 | RM-14 | A | Through Grilles For Toilet Room Vestibules | Plan & Section | |||||
| 201.05R | 10/20/69 | RM-15 | E | Revised Third Floor President's Suite | Linear Diffuser, Linear Wall Grill, Notes, Sections | |||||
| 201.05R | 12/17/69 | RM-16 | E | Alterations To A/C System For Division Head, 101, 142 & 143 | Notes, Sections | |||||
| 201.05R | 09/04/68 | RS-01 | A | Revised Mechanical Room | Plan & Section | |||||
| 201.05R | 09/16/68 | RS-02 | A | East Alcove Revision | Partial Plan, Revised Detail | |||||
| 201.05R | 09/24/68 | RS-03 | A | Revision To Detail 6/S22 | Elevation. See Detail 6/S-22 For All Additional Data | |||||
| 201.05R | 10/04/68 | RS-04 | A | Special Wall Reinforcing, First Floor | Wall Elevation, Section X-X | |||||
| 201.05R | 10/17/68 | RS-05 | A | Flange Plate Detail | Partial Roof Plan, Section | |||||
| 201.05R | 10/25/68 | RS-06 | A | Manhole Installation, Well #3 | Vicinity & Project Plans, Section | |||||
| 201.05R | 11/23/68 | RS-07 | A | Slab Removal Alternate | Partial Floor Plan, Sections | |||||
| 201.05R | 11/23/68 | RS-08 | A | Revision To South Alcove & D/S-11 | South Alcove 2nd& 5th Floor, Connection Detail, Clarification To D/S-11 Per A/21 | |||||
| 201.05R | 01/24/69 | RS-09 | A | Additional Beam, Fifth Floor South Alcove | Partial Plan, Detail | |||||
| 201.05R | 11/09/70 | RS-10 | As-Built | E | Weather Station Support System | Partial Roof Plan, Pitch Pocket Detail | ||||
| 201.05R | 02/18/69 | RS-11 | A | Modified Beam Location, South Stair | Plan, Key Plan, Section | |||||
| 201.05R | 02/18/69 | RS-12 | A | Modified Column Base, East Penthouse | Plan, Sections | |||||
| 201.05R | 02/24/68 | RS-13 | A | Relocated Existing Beam At Roof | Partial Plan, Detail | |||||
| 201.05R | 03/27/69 | RS-14 | A | Concrete Wall Alterations At South Stairs | Partial Plan, Section X-X | |||||
| 201.05R | 05/05/69 | RS-15 | A | Penthouse Stair | Landing Support | |||||
| 201.05R | 05/20/69 | RS-16 | A | Addition To Entry Canopy | Plan & Elevation | |||||
| Size Legend: A = 9"x12", B = 12"x18", C =18"x24", D = 24"x36", E = 30"x42", F= 36"x48" |