Addition of Boiler to Central Heating Plant 1969-1970 |
||||||||||
Mechanical Engineering Consultants: J. Donald Kroeker & Associates |
||||||||||
| Block/ Project | Date | Sheet Type | Sheet # | Sheet | Drawing Kind | Drawing Type | Size | Drawing Name/Description | Notes | |
| 201.06 | 08/19/70 | 1of2 | As-built | D | Basement Floor Plan | Sections Air Compressor Piping Diagram. Original 5/19/69 | ||||
| 201.06 | 08/19/70 | 2of2 | As-built | D | Bolier Room Sections & Details | Piping Digrams: Boiler Steam & Burner Fuel,Upper Boiler Room Plan, Grating Plan, Typical Column Base & Steam Main Drip | ||||
| Size Legend: A = 9"x12", B = 12"x18", C =18"x24", D = 24"x36", E = 30"x42", F= 36"x48" |