| Block/ Project | Date | Sheet Type | Sheet # | Sheet | Drawing Kind | Drawing Type | Size | Drawing Name/Description | Notes | |
Consultants: Johnson Service Company |
||||||||||
| 201CD | 12/12/67 | CD-1 | As-Built | F | CHILLED WATER SYSTEM FLOW DIAGRAM (REVISED) | CHILLER LOADING & LEAD LAG CONTROLS, FAN COIL ZONE VALVES. JOHNSON SERVICE CO. DWG #584-64-7 | ||||
| 201CD | 07/18/66 | CD-2 | As-Built | F | PORTLAND STATE COLLEGE COOLING | FAN COIL SYSTEM CONTROL, TANK LEVEL CONTROL DETAIL. JOHNSON SERVICE CO. DWG #584-64-9 | ||||
Consultants: Honeywell |
||||||||||
| 201CD | 04/23/68 | CD-3 | F | PLOT PLAN (ROUGH IN) | EXISTING NW & SE QUADRANTS, NEW NE & SW QUADRANTS. HONEYWELL DWG #68081 SHEET 1 OF 15 | |||||
Consultants: Honeywell Architectural Consultants: Wolff, Zimmer, Gunsul & Frasca Mechanical Engineering Consultants: J. Donald Kroeker |
||||||||||
| 201CD | 04/23/68 | CD-4 | F | BASEMENT FLOOR PLAN (ROUGH IN) SE/SW QUADRANTS | CHILLERS, BOILERS, SETTLING TANK, WELL. HONEYWELL DWG #68081 SHEET 2 OF 15 | |||||
Consultants: Honeywell |
||||||||||
| 201CD | 04/23/68 | CD-5 | F | BASEMENT FLOOR PLAN (ROUGH IN) NE/NW QUADRANTS | GENERAL GEOLOGY, CARTOGRAPHY, MINERALOGY, PETROGRAPHY. HONEYWELL DWG #68081 SHEET 3 OF 15 | |||||
| 201CD | 04/23/68 | CD-6 | F | GROUND FLOOR, SW QUADRANT | UPPER BOILER ROOM, DUCT SHAFT AREA. HONEYWELL DWG #68081 SHEET 4 OF 15 | |||||
| 201CD | 04/23/68 | CD-7 | F | GROUND FLOOR, NE QUADRANT | MUSEUM, EARTH SCIENCE DEPT. HONEYWELL DWG #68081 SHEET 5 OF 15 | |||||
| 201CD | 04/23/68 | CD-8 | F | FIRST FLOOR PLAN (ROUGH IN) SW QUADRANT | HONEYWELL DWG #68081 SHEET 6 OF 15 | |||||
| 201CD | 04/23/68 | CD-9 | F | FIRST FLOOR PLAN (ROUGH IN) NE QUADRANT | INTERNATIONAL RELATIONS. HONEYWELL DWG #68081 SHEET 7 OF 15 | |||||
| 201CD | 04/23/68 | CD-10 | F | SECOND FLOOR PLAN (ROUGH IN) SW QUADRANT | DUCT SHAFT AREA. HONEYWELL DWG #68081 SHEET 8 OF 15 | |||||
| 201CD | 04/23/68 | CD-11 | F | SECOND FLOOR PLAN (ROUGH IN) NE QUADRANT | SOCIOLOGY DEPT. HONEYWELL DWG #68081 SHEET 9 OF 15 | |||||
| 201CD | 04/23/68 | CD-12 | F | THIRD FLOOR PLAN (ROUGH IN) SW QUADRANT | HONEYWELL DWG #68081 SHEET 10 OF 15 | |||||
| 201CD | 04/23/68 | CD-13 | F | THIRD FLOOR PLAN (ROUGH IN) NE QUADRANT | HONEYWELL DWG #68081 SHEET 11 OF 15 | |||||
| 201CD | 04/23/68 | CD-14 | F | FOURTH FLOOR PLAN (ROUGH IN) SW QUADRANT | HONEYWELL DWG #68081 SHEET 12 OF 15 | |||||
| 201CD | 04/23/68 | CD-15 | F | FOURTH FLOOR PLAN (ROUGH IN) NE QUADRANT | CARTOGRAPHY LAB. HONEYWELL DWG #68081 SHEET 13 OF 15 | |||||
| 201CD | 04/23/68 | CD-16 | F | FIFTH FLOOR PLAN (ROUGH IN) SE/SW QUADRANTS | HONEYWELL DWG #68081 SHEET 14 OF 15 | |||||
| 201CD | 04/23/68 | CD-17 | F | FIFTH FLOOR PLAN (ROUGH IN) SE/SW QUADRANT | HONEYWELL DWG #68081 SHEET 14 OF 15 | |||||
| 201CD | 04/23/68 | CD-18 | F | FIFTH FLOOR PLAN (ROUGH IN) NW QUADRANT | HONEYWELL DWG #68081 SHEET 15 OF 15 | |||||
| 201CD | 08/30/68 | CD-19 | F | MZ UNIT (SF-5) CONTROL, NE QUADRANT | OPERATING SEQUENCE, NOTES, MATERIAL LIST, TYPICAL ZONE CONTROL, RESET SCHEDULE. HONEYWELL DWG #934-68081-1CI SHEET 1 OF 16 | |||||
| 201CD | 08/30/68 | CD-20 | F | MZ UNIT (SF-6) CONTROL, SW QUADRANT | OPERATING SEQUENCE, NOTES, MATERIAL LIST, TYPICAL ZONE CONTROL, RESET SCHEDULE. HONEYWELL DWG #934-68081-2CI SHEET 2 OF 16 | |||||
| 201CD | 01/13/70 | CD-21 | F | FIFTH FLOOR MZ UNIT SF-7 CONTROL, SW QUADRANT | TYPICAL ZONE CONTROL, FAN COIL CONTROL, RESET SCHEDULE. HONEYWELL DWG #934-68081-3CI SHEET 3 OF 16 | |||||
| 201CD | 08/30/68 | CD-22 | F | CHANGED 314394 TO 315783 COVER (SF-7), ETC. | OPERATING SEQUENCE, MATERIAL LIST, PANEL A7. HONEYWELL DWG #934-68081-4CI SHEET 4 OF 16 | |||||
| 201CD | 07/29/68 | CD-23 | F | REVISED VENT UNIT FAN | TYPICAL ZONE CONTROL, RESET SCHEDULE, REVISED (VU) VENT UNIT FANALSO. HONEYWELL DWG #934-68081-5CI SHEET 5 OF 16 | |||||
| 201CD | 05/03/68 | CD-24 | F | OPERATING SEQUENCE/MATERIAL LIST, SF-3 ETC. | OPERATING SEQUENCE, MATERIAL LIST, PANEL A3. HONEYWELL DWG #934-68081-6CI SHEET 6 OF 16 | |||||
| 201CD | 05/03/68 | CD-25 | F | (DUPLICATE OF CD-24) | ||||||
| 201CD | 07/29/68 | CD-26 | F | TYPICAL ZONE CONTROL, SF-1 & SF-2 | RESET SCHEDULE. HONEYWELL DWG #934-68081-7CI SHEET 7 OF 16 | |||||
| 201CD | 05/06/68 | CD-27 | F | OPERATING SEQUENCE/MATERIAL LIST SF-2 ETC. | HONEYWELL DWG #934-68081-8CI SHEET 8 OF 16 | |||||
| 201CD | 07/29/68 | CD-28 | F | TYPICAL ZONE CONTROL SF-1 & SF-2 | RESET SCHEDULE. HONEYWELL DWG #934-68081-9CI SHEET 9 OF 16 | |||||
| 201CD | 05/06/68 | CD-29 | F | OPERATING SEQUENCE/MATERIAL LIST SF-1 | HONEYWELL DWG #934-68081-10CI SHEET 10 OF 16 | |||||
| 201CD | 07/29/68 | CD-30 | F | TYPICAL ZONE CONTROL, SUPPLY FAN SF-4 | HONEYWELL DWG #934-68081-11CI SHEET 11 OF 16 | |||||
| 201CD | 12/17/69 | CD-31 | F | ADDED WELLS & STARTER, CONTROL PANEL A4 | REVISED WELL PUMP #3 WIRING TO 24V, OPERATING SEQUENCE, MATERIAL LIST. HONEYWELL DWG #934-68081-12CI SHEET 12 OF 16 | |||||
| 201CD | 07/29/68 | CD-32 | F | REVISED HF-6 WIRING (STARTERS, ETC.) | OPERATING SEQUENCE, MATERIAL LIST. HONEYWELL DWG #934-68081-13CI SHEET 13 OF 16 | |||||
| 201CD | 06/02/70 | CD-33 | As-Built | F | COOLING PIPING CONTROL WCU-3 (REVISED) | HONEYWELL DWG #934-68081-14CI SHEET 14 OF 16 | ||||
| 201CD | 10/04/68 | CD-34 | F | OPERATING SEQUENCE/MATERIAL LIST WCU-3, ETC. | OPERATING SEQUENCE, MATERIAL LIST. HONEYWELL DWG #934-68081-15CI SHEET 15 OF 16 | |||||
| 201CD | 04/09/70 | CD-35 | F | COOLING PUMPS, EXISTING CENTRAL PANEL, REVISIONS & ADDITIONS | HONEYWELL DWG #934-68081-16CI SHEET 16 OF 16 | |||||
Consultants: Robert Shaw Control Company |
||||||||||
| 201CD | 01/26/84 | CD-36 | B | SF-7 MODIFICATIONS CONTROL PANEL | Robert Shaw Control Company | |||||
| 201CD | 01/27/84 | CD-37 | B | SF-7 MODIFICATIONS GRAPHIC FLOW DIAGRAM | Robert Shaw Control Company | |||||