Facilities Detail Drawings |
|||||||||
|---|---|---|---|---|---|---|---|---|---|
Architectural Consultants & Owner: PSU Facilities & Planning |
|||||||||
| Block/ Project | Date | Sheet Type | Sheet # | Sheet | Drawing Kind | Drawing Type | Size | Drawing Name/Description | Notes |
| 201D | 12/11/68 | D-01 | D | ROOM BO3 REAGENT RACK | PLAN VIEW, ELEVATION, FULL-SCALE SECTION | ||||
| 201D | 04/23/70 | D-02 | A | DOOR ADDITION TO WORK AREA | TYPICAL ALL FLOORS | ||||
| 201D | 09/02/70 | D-03 | B | RELITE ROOM 341U | HEAD, JAMB, SILL DETAILS | ||||
| 201D | 11/16/70 | D-04 | A | INSTRUMENT CABINET ROOM 418 | ELEVATION & SECTION | ||||
| 201D | 01/24/85 | D-05 | A | TACKBOARDS FOR EDUCATIONAL ACTIVITIES C107 | South Elevation | ||||
| 201D | 01/24/85 | D-06 | A | TACKBOARDS FOR EDUCATIONAL ACTIVITIES C307, C207 & C407 | South Elevation | ||||
| 201D | 03/18/70 | D-07 | A | BOOKSHELF DETAIL ROOM 111A | South Elevation | ||||
| 201D | 06/03/70 | D-08 | A | ALTERATIONS TO ALCOVE SEATS | SEAT SECTION | ||||
| 201D | 06/24/70 | D-09 | D | TV MONITOR CONSOLE 287L | CROSS-SECTION, ELEVATIONS, HARDWARE REQUIREMENTS, PLASTIC LAMINATE NOTES | ||||
| 201D | 06/07/85 | D-10 | A | EAST SKYLIGHT REPAIR FIRST FLOOR | CAULKING & SHEET METAL DETAIL | ||||
| 201D | 11/04/86 | D-11 | A | DOOR & FRAME ROOM 341 | DOOR FRAME SECTION | ||||
| 201D | D-12 | DOOR REPLACEMENT ROOM 339 | |||||||
| 201D | D-13 | CASEWORK FOR ROOMS 325 & 328 | |||||||
| 201D | D-14 | DISPLAY CABINET, ROOM 317? | |||||||
| 201D | D-15 | CABINETS ROOM 303 | |||||||
| 201D | D-16 | ART STORAGE CABINET ROOM 325 & 328 | |||||||
| 201D | D-17 | SERVER UNIT TABLE ROOM 325 & 328 | |||||||
| 201D | D-18 | CABINET ELEVATION | |||||||
| 201D | D-19 | CABINET SECTION | |||||||
| Size Legend: A = 9"x12", B = 12"x18", C =18"x24", D = 24"x36", E = 30"x42", F= 36"x48" | |||||||||