Block 201 Cramer Hall Drawing Archives
Facilities Mechanical Drawings
Architect/Owner: PSU Facilities & Planning
Block/ Project Date Sheet Type Sheet # Sheet Drawing Kind Drawing Type Size Drawing Name/Description Notes
201M 09/17/70   M-1       D Primary Chilled Water System Includes Smith Memorial Center & South Park Hall (Neuberger Hall)
201M 03/11/71   M-2       B Compressed Air System Oil Removal  
201M 04/20/71   M-3       D Fuel Oil Tank No. 2 Oil Piping & Heating Systems, Section At Access Pit, Shaft & Lever Arm Details, Valve Location
201M 05/19/71   M-4       B Cooling Plant Heat Exchanger Bypass  
201M 04/02/73   M-5       A Installation of Backflow Preventer Diagram of Piping Changes, Revised From 11/07/72
201M 03/23/77   M-6       B Fume Hood Installation Room 92 Anthropology Labratory Notes
201M 11/17/77   M-7       B Shop Sketch, Duct & Diffuser Changes Room 594  
201M 11/23/77   M-8       B High Efficiency Air Filter Installation SF5  
201M 11/29/77   M-9       B High Efficiency Filter Installation SF6  
201M 12/02/77   M-10       B Boiler Chemical Feed Pump Modification, East Heating Plant  
201M 06/29/77   M-11       B Boiler Control Wiring, Boilers 4 & 5  
201M 12/30/70   M-12       B Boiler Plant Chiller #3 Chiller WCU-3 Motor Cooling Water
201M 07/23/84   M-34       D Mechanical Remodel Computer Lab 322, Room 516 Aligned Section, Partial Plan
201M 05/06/82   M-35       C Roof Mounting Frame For Carrier 30AQ024 Penthouse Roof Various Elevations
201M 08/01/83   M-36       D SF-7 Heat Pump Conversion Heat Pump, Mechanical Notes, Fifth Floor Plan
201M 08/24/87   M-37       D 345/349 Rehabilitation Mechanical Plan, Equipment Schedule, Details: Ceiling Supply Diffuser & Return Grille, EF-1 Installation
201M 12/18/90   M-38       A Pipe Replacement  
Size Legend: A = 9"x12", B = 12"x18", C =18"x24", D = 24"x36", E = 30"x42", F= 36"x48"