Block 202: Lincoln Hall Drawing Archives
Project 202.08: Lincoln Hall Alterations 1974
Consultants:
WEGROUP ARCHITECTS; GRANT KELLEY & ASSOC., EE; FRANK HONEY & ASSOC., SE; KEITH KRUCHEK, ME
List of Contents:
- 0 - COVER SHEET
- 01 - GROUND FLOOR DEMOLITION
PLAN
- 02 - FIRST FLOOR DEMOLITION
PLAN
- 03 - SECOND FLOOR DEMOLITION
PLAN
- 04 - GROUND FLOOR PLAN
- 05 - FIRST FLOOR PLAN
- 06 - SECOND FLOOR PLAN
- 07 - THIRD FLOOR PLAN
- 08 - AUDITORIUM FLOOR
PLAN
- 09 - MEZZANINE FLOOR PLAN,
THRUST STAGE & TRAP DETAILS
- 10 - E & PARTIAL S ELEVATIONS,
DETAILS
- 11 - N S W E SECTIONS
- 12 - AUDITORIUM SECTIONS & DETAILS
- 13 - BACKSTAGE SECTIONS
- 14 - STAGE SECTIONS & SIDE STAGE DETAILS
- 15 - STAGE SECTIONS & RIGGING DETAILS
- 16 - AUDITORIUM BACKWALL & CEILING DETAILS
- 17 - GROUND FLOOR ROOM
ELEVATIONS 2A 5 76
- 18 - GROUND FLOOR ROOM
ELEVATIONS & MISCELLANEOUS DETAILS
- 19 - FIRST FLOOR LOBBY
L103 ELEVATIONS
- 20 - FIRST FLOOR LOBBY
L101 L102 L104 L105 ELEVATIONS & DETAILS
- 21 - FIRST FLOOR ROOM
105 107 & CORRIDOR ELEVATIONS
- 22 - WALL DETAILS
- 23 - WALL & FLOOR DETAILS
- 24 - DOOR & WINDOW DETAILS
- 25 - GROUND FLOOR REFLECTED
CEILING PLAN
- 26 - ROOM FINISH & DOOR
SCHEDULES
- C1 - REVISED FIRST FLOOR
CORRIDOR LIGHTING PLAN C101 C102
- C15 - GROUND FLOOR PIPING
REVISIONS
- C15A - ELEVATION OF
EXPOSED INNER WALL OF BANDROOM, SOUTH WALL DETAIL
- C16 - BALCONY FRAMING
DETAILS/STAIRS
- C21 - PIPING REVISIONS,
GROUND FLOOR
- C22 - REVISED REFLECTED
CEILING PLAN ROOM 2A
- C23 - SPRINKLER STANDPIPE
CLARIFICATION PARTIAL GROUND FLOOR PLAN
- C24 - GROUND FLOOR CORRIDOR
REFLECTED CEILING PLAN
- C25 - CONTROL ROOM WALL
SECTION
- C26 - AUDITORIUM CEILING
SECTIONS ROOM 175
- E1 - GROUND FLOOR PLAN
- E2 - FIRST FLOOR
- E3 - SECOND FLOOR PLAN & CAT WALKS
- E4 - STAGE LIGHTING PLANS
- E5 - LOBBY COAT STORAGE,
CONTROL BOOTH, PROJECTION ROOM, ORCHESTRA
- E7 - ROOF PLAN, LIGHTING
DIAGRAMS
- M1 - GROUND FLOOR PLAN
- M10 - SCHEDULES, DUCT
CONSTRUCTION DETAILING
- M11 - BASEMENT FAN & MECHANICAL ROOM
- M12 - UPPER & LOWER PLENUM,
PLANS & SECTIONS
- M13 - PIPING DIAGRAMS,
CENTRAL HEAT, COIL PIPING
- M14 - 6" SUPPLY & RETURN,
RAIN DRAIN DETAILS
- M15 - SPRINKLER LAYOUT
ON 1ST 2ND 3RD F; PIPING DIAGRAMS 105B 107B
- M2 - FIRST FLOOR PLAN
- M3 - SECOND FLOOR PLAN
- M4 - THIRD FLOOR PLAN
- M5 - ATTIC FLOOR PLAN
- M6 - ROOF PLAN
- M7 - AUDITORIUM SECTION & ELEVATIONS
- M8 - BAND ROOM (2A) MEZZANINE
(M63) MUSIC LIBRARY (104, 2B, 102)
- M9 - MEZZANINE (M63) ORCHESTRA
PIT
- S1 - FIRST FLOOR FRAMING
PLAN
- S2 - AUDITORIUM FLOOR
DETAILS
- S3 - LOBBY STAIRS
- S4 - STAGE RIGGING
- S5 - STAGE DETAILS
- S6 - THIRD FLOOR, ROOF & SKYLIGHT FRAMING PLAN
- S7 - BACKSTAGE ALTERNATE
NO. 1 & ORCHESTRA PIT #2 FRAMING PLAN
- S8 - BACKSTAGE & ORCHESTRA
PIT DETAILING
- VT1 - ELEVATOR DETAILS