Block 231: Peter W. Stott Center Drawing Archives
Project 231CD: Facilities Control Documents
Consultants:
1-14
List of Contents:
- CD-01 - H-1 THRU H-5
ZONE HEATING COIL CONTROL, SF-1 CONTROL AS-BUIL
- CD-02 - H-6 THRU H-8
ZONE HEATING COIL, SF-2 CONTROL AS-BUILT
- CD-03 - SMALL GYM 114
HEATING & VENT CONTROL AS-BUILT
- CD-04 - LOCKER AREA
HEAT & VENT CONTROL, ZONE HEATING CONTROL H-10 THR
- CD-05 - MAIN GYM 255
HEATING & VENT CONTROL AS-BUILT
- CD-06 - POOL 136 HEATING & VENTILATING CONTROL AS-BUILT
- CD-07 - ACTIVITY SUPPLY
UNIT CONTROL 207 AS-BUILT
- CD-08 - ACTIVITY ROOM
SUPPLY UNIT CONTROL 203 AS-BUILT
- CD-09 - MAIN LOBBY
SU CONTROL 256, POOL MECHANICAL ROOM EXHAUST AS-B
- CD-10 - TRANSFORMER
VAULT 168 EXHAUST CONTROL, CONTROL AIR COMPRESSOR
- CD-11 - MASTER SUBMASTER
SETTING SCHEDULE AS-BUILT
- CD-12 - OPERATING SEQUENCE
AS-BUILT
- CD-13 - BOILER FEED
PUMP PANEL & WIRING, OFFICE CONTROL PANEL WIRING
- CD-14 - CONTROL PANEL
WIRING & LAYOUT AS-BUILT
- CD-15 - FLOOD ALARM
CONTROL (POOL PUMPS & CHLORINE PUMP)